![Agilent Technologies 8890 Скачать руководство пользователя страница 236](http://html.mh-extra.com/html/agilent-technologies/8890/8890_maintaining-manual_2867678236.webp)
14 Maintaining the ECD
To Install a Capillary Column in the ECD
236
Maintaining Your GC
To Install a Capillary Column in the ECD
1
Gather the following:
•
“Consumables and Parts for the ECD”
•
Column nut
•
Septum
•
Column
•
1/4-inch, 5/16-inch, and 9/16-inch wrenches
•
Column cutter
•
Lint-free gloves
2
Place GC in maintenance mode:
Maintenance > Instrument > Perform Maintenance >
Maintenance Mode > Start Maintenance.
Wait for the GC to become ready.
WARNING
Be careful! The oven and/or detector may be hot enough to cause burns. If the detector is
hot, wear gloves to protect your hands.
WARNING
Wear safety glasses to protect your eyes from flying particles while handling, cutting, or
installing glass or fused silica capillary columns. Use care in handling these columns to
prevent puncture wounds.
3
Load the
inlet maintenance method
and wait for the GC to become ready.
CAUTION
Wear clean, lint-free gloves to prevent contamination of parts with dirt and skin oils.
4
Place a septum (if the column id is
≤
0.2 mm), capillary column nut, and ferrule on the
column.
5
Score the column using a glass scribing tool. The score must be square to ensure a clean
break.
Ferrule
Column nut
Septum
Содержание 8890
Страница 1: ...Agilent 8890 Gas Chromatograph Maintaining Your Gas Chromatograph GC ...
Страница 8: ...8 Maintaining Your GC ...
Страница 22: ...2 Removing Covers To Remove the Electronics Cover 22 Maintaining Your GC ...
Страница 28: ...3 Maintaining the GC To Change the Hydrogen Sensor Calibration Gas Cylinder 28 Maintaining Your GC ...
Страница 48: ...4 Maintaining Capillary Columns To Remove the Ferrule From a CFT Fitting 48 Maintaining Your GC ...
Страница 120: ...7 Maintaining the COC Inlet To Bakeout Contaminants from the COC Inlet 120 Maintaining Your GC ...
Страница 142: ...8 Maintaining the MMI To Bakeout Contaminants from the MMI 142 Maintaining Your GC ...
Страница 178: ...10 Maintaining the VI To Bakeout Contaminants from the VI Inlet 178 Maintaining Your GC ...
Страница 208: ...12 Maintaining the TCD To Bakeout Contaminants from the TCD 208 Maintaining Your GC ...
Страница 240: ...14 Maintaining the ECD To Bakeout the ECD 240 Maintaining Your GC ...
Страница 264: ...16 Maintaining EPC Modules Installing or Replacing Frits in the PCM 264 Maintaining Your GC ...
Страница 276: ...17 Maintaining a Valve To Install the Upper Valve Box 276 Maintaining Your GC ...
Страница 282: ...www agilent com Agilent Technologies Inc 2019 First edition January 2019 G2790 90015 G3540 90015 ...