Replacement procedures
3.
Lift the filter trap from the LCO2 bracket and then slide the manifold
assembly out of the chassis.
4.
Replace the manifold assembly and plumbing and reassemble in reverse
order.
5.
Check the system for leaks.
Removing the PTV manifold only
1.
Remove the plumbing block from the front of the manifold by removing
the screws.
2.
Inspect the O-rings in the block for damage and replace if necessary.
3.
Slide the manifold from the chassis and replace.
4.
Installation is the reverse of removal.
5.
Check the system for leaks.
Replacing the plumbing assemblies
1.
Turn off the oven and the inlet and allow them to cool.
WARNING
Turn off the oven and the inlet and allow them to cool. Turn off all flows at
the initial gas supply. Then turn off the main power switch and unplug the
power cord.
2.
Remove the top cover, the inlet fan cover, the inlet cover, the top rear
panel, and the pneumatics chassis cover.
3.
Remove the column.
4.
Loosen the three captive Torx screws which secure the inlet to the oven,
and lift the PTV inlet out of the oven.
5.
To replace the PTV gang weldment, disconnect the plumbing block from
the PTV manifold assembly. Then, disconnect the carrier gas line and the
septum purge line (septum head only) from the inlet. Unscrew the filter
trap assembly and remove the PTV gang weldment assembly.
Содержание 6890 Series
Страница 1: ...6890 Series Gas Chromatograph Service Manual ...
Страница 2: ...6890 Series Gas Chromatograph Service Manual ...
Страница 27: ...24 of 24 Jun 2001 Contents Contents Agilent 6890 Gas Chromatograph Service Manual ...
Страница 29: ......
Страница 39: ......
Страница 195: ...260 Solvent Vapor Exit Accessory Leak testing 10 of 10 Jun 2001 Inlets Agilent 6890 Gas Chromatograph Service Manual ...
Страница 207: ......
Страница 389: ...360 Auxiliary EPC Replacement procedures 16 of 16 Jun 2001 Detectors Agilent 6890 Gas Chromatograph Service Manual ...
Страница 391: ......
Страница 459: ......
Страница 479: ...520 Gases Supplying valve actuator air 14 of 14 Jun 2001 Site Preparation Agilent 6890 Gas Chromatograph Service Manual ...
Страница 485: ...530 Power Grounding 6 of 6 Jun 2001 Site Preparation Agilent 6890 Gas Chromatograph Service Manual ...
Страница 491: ...540 Instrument Specifications Detectors 6 of 6 Jun 2001 Site Preparation Agilent 6890 Gas Chromatograph Service Manual ...
Страница 492: ...600 Performance Verification How to check the performance of the 6890 instrument 610 Checkout Chromatograms ...
Страница 493: ......
Страница 521: ......
Страница 523: ......
Страница 555: ...840 Shutdowns 10 of 10 Jun 2001 Error Codes and Internal Diagnostics Agilent 6890 Gas Chromatograph Service Manual ...
Страница 580: ...900 Remote Access Remote Access information was not available for this printing ...
Страница 581: ......
Страница 583: ......
Страница 631: ......
Страница 637: ...1110 Valves Liquid sample valves 6 of 6 Jun 2001 Valves Agilent 6890 Gas Chromatograph Service Manual ...
Страница 647: ...1120 Valve Box Removing the valve box assembly 10 of 10 Jun 2001 Valves Agilent 6890 Gas Chromatograph Service Manual ...
Страница 675: ...1150 Troubleshooting Pressure check 6 of 6 Jun 2001 Valves Agilent 6890 Gas Chromatograph Service Manual ...
Страница 677: ......
Страница 717: ...1225 Main Board 6890N Fuses 6 of 6 Jun 2001 Electrical Agilent 6890 Gas Chromatograph Service Manual ...
Страница 737: ......