7
General Maintenance
To Replace a Filament in an EI XTR, SS, or Inert Source
5977B Series MSD Operating Manual
215
To Replace a Filament in an EI XTR, SS, or
Inert Source
Materials needed
•
Filament assembly (G7005-60061)
•
Gloves, clean, lint-free
•
Large (8650-0030)
•
Small (8650-0029)
•
Hex ball driver, 1.5-mm (8710-1570)
Procedure
1
2
Open the analyzer chamber. (See
“To Open the Analyzer Chamber”
3
Remove the ion source. (See
“To Remove the EI XTR, SS, or Inert Source”
4
Remove the gold plated screw and washer from the filament. (See
5
Slide the filament assembly off the ion source assembly.
WARNING
The analyzer operates at high temperatures. Do not touch any part until you
are sure it is cool.
Содержание 5977B CI MSD
Страница 1: ...Agilent 5977B Series MSD Operating Manual ...
Страница 12: ...12 5977B Series MSD Operating Manual ...
Страница 34: ...1 Introduction To Replace the Primary Fuses 34 5977B Series MSD Operating Manual ...
Страница 54: ...2 Installing 8890 GC Columns The GC MSD Interface for an 8890 Series GC 54 5977B Series MSD Operating Manual ...
Страница 100: ...4 Installing 7890 GC Columns The GC MSD Interface for a 7890B Series GC 100 5977B Series MSD Operating Manual ...
Страница 142: ...5 Operating in EI Mode To Pumpdown the MSD 142 5977B Series MSD Operating Manual ...
Страница 252: ...8 CI Maintenance To Install the CI Source 252 5977B Series MSD Operating Manual ...
Страница 253: ......
Страница 254: ...www agilent com Agilent Technologies Inc 2019 First edition January 2019 G7077 90034 G7077 90034 ...