Agilent Technologies 1989–2002
Agilent 3070 / 79000 Site Preparation
10-126
Chapter 10: Site Preparation – Power Requirements for Older Systems: Tester Power Requirements (Series I/II)
NOTE
The wire sizes recommended in this chapter are
for the SO cord
1
from the receptacle to the
system. The electrician has the responsibility to
size the service to the receptacle so that the
voltage drop from the source to the 3070 system
does not exceed 5-percent of the nominal voltage.
1
SO - Service with Oil-resistant jacket
Table 10-29
3070 Series I, E1131A power requirements for all power options
317X
307X
POTS Bay
Testhead (PDU #1)
Support Bay (PDU #2)
Full Load Amps (FLA)
36
31
16 16
Breaker Size in Amps
40
40
20
20
SO Cord Wire Size mm2 (American Wire Gauge - AWG)
10 (8)
10 (8)
4 (12)
4 (12)