
26
30549 R1
Figure 21.
3.7. PTO (CV) Driveline Installation
1. Clean PTO driveline and flighting shaft ends of any paint or dirt before assembly.
2. Slide plain end of PTO driveline onto flighting shaft. Make sure that the 5/16" dia. holes for the roll pin are
lined up.
Protect your eyes when performing this operation.
3. Carefully tap in 5/16" roll pin. Tighten setscrew.
4. Install sprocket shield on boot using four 5/16" x 3/4" bolts.
5. Slide PTO transport saddle through support strap on boot and rest PTO driveline in it until connected to
tractor (see
).
• Never use a PTO driveline without a rotating shield in good working order.
• Disconnect PTO driveline from tractor during transport and placement.
MK/HX 10-36 – SWING-AWAY GRAIN AUGER