Control gates installed properly so material flow directed down backplate of loader.
Control gates open from the back toward the front of the loader.
Side loading controlled by a control gate.
High velocity flow slowed and controlled.
Belt Installation
Belt pre-stretched during installation.
Belt cut and spliced square and straight.
Belt splice properly installed according to the splice manufacturer's specifications.
Belt properly tensioned following the belt tension procedure in this manual.
Take-up rods, nuts, and washer areas properly lubricated.
Take-up section leveled after the belt was tensioned.
Splice protectors / wiper cleats properly installed.
Covers
Covers installed, securely held in place with T-bars, L-bars, and wing nut assemblies.
Covers that are not standard length are "cut-to-length" in the field.
Covers measured & factory ordered. Secured w/ T-bars, L-bars, wing nut assemblies.
All covers inspected so that rain or water will not get into the conveyor enclosure.
Aspiration
Dry-ambient - aspiration to maintain slight negative pressure in conveyor enclosure.
Hot-moist - aspiration/insulation for slight neg. pressure & to prevent condensation.
Motor & Drive
Motor, drive, couplings, etc. securely locked in place and properly aligned.
Proper belt, chain, couplings, cooling fan and other required guards properly installed.
Drive lubrication oil properly filled.
Bearings properly lubricated.
Monitors
Speed / motion monitor properly installed and tested.
Discharge spouting or "overshot" plug monitor properly installed and tested.
Other required monitors properly installed and tested.
Belt Tension
The proper belt tension checked using the belt tension procedure in this manual.
Take-up rods, nuts, and washer areas properly lubricated.
Final Inspection
All tools, debris, etc. removed inside and out of the conveyor prior to initial start-up.
Test Start-Up
Covers removed and conveyor visually inspected for proper operation.
The head and tail sections visually inspected for proper operation.
Conveyor started with small load, then 25%, 50%, 75%, and finally a full load.
Final inspection during operation shows it is operating properly.
Preventative Maintenance
Set up a preventative maintenance according to application. Please refer to the page 83 as a
reference to write a complete PM schedule for a specific application.
Содержание HI LIFE
Страница 6: ...HI ROLLER BELT CONVEYORS HI ROLLER MINI ROLLER LO ROLLER HI LIFE 6 P115506 R3 ...
Страница 124: ...8 TROUBLESHOOTING HI ROLLER BELT CONVEYORS HI ROLLER MINI ROLLER LO ROLLER HI LIFE 124 P115506 R3 ...
Страница 132: ...HI ROLLER BELT CONVEYORS HI ROLLER MINI ROLLER LO ROLLER HI LIFE 132 P115506 R3 ...