P1512115 R8
73
Figure 52.
Motor Mount Tap Bolts
4.24.4 Install the Motor and Back Plates
1. Install the gas engine or electric motor (1) on the slider mount. At the same time, secure the ground wires
for the battery, and clutch (if equipped), to the motor mount bolt (location indicated by the red arrow) using
a flat washer (see
Important
Installation and wiring for the gas engine or the electric motor are to be done by a certified
technician and should be based on OEM (original equipment manufacturer) specifications. Some
hardware has been included in the drive kit. Not all installations will require all parts. After the
conveyor is completely assembled, place finishing zip-ties on all cables and wiring to ensure all lines
are snug in place.
Note
For Kohler engines, for the approximate correct position of the engine on the slider mount, measure
2–5/8" from the engine base to the outer edge of the slider mount pipe. Also measure
approximately 7/8" from the slider bar closest to the hopper to the edge of the slider mount closest
to the hopper. Then snugly install the motor mount bolts (but do not tighten).
Æ
2.
For a gas engine:
a.
Secure the engine drain hose on the engine base (not shown).
b. Install the choke and throttle cables to the engine and route them to the control box.
c. Fasten the top end of the muffler support bracket onto the muffler shield and muffler (not shown).
d. Install the engine exhaust pipes onto the engine (not shown). Install the muffler and muffler shield onto
the engine exhaust pipes. Install the rain cap on the muffler.
e. Fasten the bottom end of the muffler support bracket to the top of the base of the engine block with a
motor mount bolt.
f. Fill engine with oil up to the dipstick line (see
).
6
6
PORTABLE GRAIN BELT CONVEYOR – FIELD LOADER