4.
The feed channel floor can at this time move up and down through the double acting valve in the
tractor.
5.
Operate the double acting valve in the tractor until the feed channel floor is fully open. The colour of
the feed channel floor symbol changes from black
to red. The cutting knives are in the home
position and fully retracted into the feed channel floor.
6.
Stop the tractor engine and remove the key.
7.
Isolate the tailgate with the hydraulic shut-off valve.
8.
Remove the bolts.
9.
Remove the seal plate.
10.
Release the tailgate with the hydraulic shut-
off valve.
11.
Start the tractor engine.
12.
Close the tailgate with the controller in the
tractor.
13.
Move the feed channel floor up with the
controller and the double acting valve in the
tractor.
NOTE:
To decrease loss of the material while
you make bales of hay or straw. Make sure
that you install the seal plate.
GUID-851EFC90-7496-4B25-9181-6A84129002B5-high.jpg [High]
Fig. 12
3.1.14 Setup the E-Link Pro Display
Before starting the procedure
• Connect the E-Link Pro to the machine
• Set the E-Link Pro with the On/Off button (A)
• Push the toggle button
(F5), the configuration page will show.
Procedure
1.
Setup Country and Language.
a) Push
(F8) on the configuration page. The page "Regional Configuration" will show
b) Push the line "Country"
c) Push the button
or
to make your country selection
d) Push [OK] to set the country and go back to the page "Regional Configuration"
e) Push the line "Language"
f) Push the button
or
to set your language
g) Push [OK] to set the language and go back to the page "Regional Configuration". Push the button
and then push the button
to restart the controller. The interface will show in the new
language from the selection made.
2.
Setup Display and Sound.
a) Push
(F6) on the configuration page. The page "Display/Sound Configuration" will show
b) Push the line "Brightness"
GUID-CB67B5E0-E16F-4A77-B4BE-0204BE36475C [V1]
3. Operation
76
Baler Wrapper Combination
4900.LE.EN01
Содержание LELY RPC 130 F
Страница 2: ......
Страница 8: ...Table of contents 8 Baler Wrapper Combination 4900 LE EN01...
Страница 32: ...1 Safety 32 Baler Wrapper Combination 4900 LE EN01...
Страница 34: ...Table of contents 34 Baler Wrapper Combination 4900 LE EN01...
Страница 110: ...3 Operation 110 Baler Wrapper Combination 4900 LE EN01...
Страница 112: ...Table of contents 112 Baler Wrapper Combination 4900 LE EN01...
Страница 122: ...Danger Zones page 31 4 Maintenance and Lubrication 122 Baler Wrapper Combination 4900 LE EN01...
Страница 148: ...Table of contents 148 Baler Wrapper Combination 4900 LE EN01...
Страница 158: ...Table of contents 158 Baler Wrapper Combination 4900 LE EN01...
Страница 164: ...6 Specifications 164 Baler Wrapper Combination 4900 LE EN01...
Страница 167: ......
Страница 168: ...AGCO Corporation 2018 All rights reserved 4900 LE EN01 English May 2018...