a) If automatic bale wrapping is "ON" wrapping starts automatically
b) If manual bale wrapping is "ON", you must push the button
to start the wrapping
c) When the wrapping is done, eject the bale.
7.
You can always stop the tractor and start the net tying procedure if the bale is not at the target
dimension, push the button
. Use this when almost all bales on the field are done and the last
bale becomes too large or too small.
3.5.11 Eject a Bale from the Wrapper
Before starting the procedure
WARNING: Injury to persons.
Do not release the bale if there is a risk that the bale will roll or tilt. You must be more
careful on slopes, hills, ditches and other. If a bale rolls DO NOT try to stop it.
After a bale is wrapped with film, the bale has to be released.
Make sure that the release starts:
Procedure
1.
If automatic bale release is "ON", this starts automatically.
2.
If manual bale release is "ON", you must push and hold the button
to start the release.
3.5.12 Remove a Blockage
Before starting the procedure
WARNING: Magnetic fields.
Do not do work on the magnets of the blade holders if you have a cardiac pacemaker or
other implant. Magnetic fields can have an effect on their operation.
WARNING: Risk of Injury.
Do not remove a blockage by hand or by foot.
You can increase the clearance at the bottom of the rotor by opening the feed channel floor hydraulically
from the tractor. The lower baling roller will hold material that does not move freely and move it to the
baling chamber.
Procedure
1.
Stop driving but keep the engine on.
2.
Disengage the Power Take-Off (PTO) shaft.
3.
On the E-Link Pro, push the button
to engage the feed channel floor. The feed channel floor can
at this time, move up and down with the double acting valve in the tractor.
4.
Operate the double acting valve in the tractor until:
a) The feed channel floor is fully open. The feed channel floor symbol is red not black
b) The cutting blades are in the non cutting position.
5.
Decrease the engine speed and set the PTO shaft to on. The rotor moves the material to the baling
chamber.
6.
If the blockage is there at this time:
GUID-C8D1FF53-2B86-43D3-BE83-6BB0E2653F2B [V1]
GUID-F33D667B-7D9C-411A-9905-C330B91FAD95 [V1]
3. Operation
102
Baler Wrapper Combination
4900.LE.EN01
Содержание LELY RPC 130 F
Страница 2: ......
Страница 8: ...Table of contents 8 Baler Wrapper Combination 4900 LE EN01...
Страница 32: ...1 Safety 32 Baler Wrapper Combination 4900 LE EN01...
Страница 34: ...Table of contents 34 Baler Wrapper Combination 4900 LE EN01...
Страница 110: ...3 Operation 110 Baler Wrapper Combination 4900 LE EN01...
Страница 112: ...Table of contents 112 Baler Wrapper Combination 4900 LE EN01...
Страница 122: ...Danger Zones page 31 4 Maintenance and Lubrication 122 Baler Wrapper Combination 4900 LE EN01...
Страница 148: ...Table of contents 148 Baler Wrapper Combination 4900 LE EN01...
Страница 158: ...Table of contents 158 Baler Wrapper Combination 4900 LE EN01...
Страница 164: ...6 Specifications 164 Baler Wrapper Combination 4900 LE EN01...
Страница 167: ......
Страница 168: ...AGCO Corporation 2018 All rights reserved 4900 LE EN01 English May 2018...