
13
LEVELING THE UNIT
Leveling the unit:
Unit MUST be installed level in all planes, on a floor that is
strong enough to support a fully loaded freezer. See
Figure 14.
This unit is equipped with front and rear rollers. Rollers will
aid during installation. Rear rollers are adjustable from the
front of the unit. Total adjustment is +
5
⁄
16
, -
5
⁄
16
. Turn adjust-
ing bolt with a
7
⁄
16
" wrench clockwise to raise cabinet and
counterclockwise to lower cabinet. See Figure 15.
All four front leveling legs must be adjusted to the floor for
leveling and to prevent the unit from rolling during use. See
Figure 15.
NOTE
Figure 14
Figure 15
-Rear Roller Adjustment Bolt
(Use
7
⁄
16
open end wrench or
socket and ratchet)-
-Both front leveling legs must be
adjusted to floor after leveling,
for each unit
Front
leveling
leg-