6 - WORKING OPERATIONS
Install tunnel extension on to tunnel
The tunnel extension is stored on the top of the tunnel. Two people are required for this procedure.
1. Attach the bag boom hook
(1)
to the lift eye
(2)
located
at the center of the tunnel extension
(3)
.
RAIL16GEN0119AA
1
2. Remove the clip pin and retainer pin
(1)
holding the
tunnel extension to the bagger. This is the top center
pin
(2)
on the extension.
RAIL16GEN0120AA
2
3. Using the bag boom, swing the tunnel extension out
and lower to a position in front of the tunnel. Line up
the five pins
(1)
on the extension
(2)
with the five re-
ceiver tubes
(3)
on the tunnel. Slide the tunnel exten-
sion pins into the receiver tubes.
4. Secure in place with the pins and clips supplied with
your bagger.
RAIL16GEN0121AA
3
5. Unhook the bag boom
(1)
from the lift eye
(2)
on the
tunnel extension
(3)
.
6. Fold the eye
(2)
down against the tunnel extension to
prevent damage to the bag.
RAIL16GEN0119AA
4
6-27
Содержание LX1214
Страница 8: ......
Страница 11: ...1 GENERAL INFORMATION Your machine RAIL16SP00177FA 1 Ag Bag silage bagger 1 3 ...
Страница 28: ...2 SAFETY INFORMATION California proposition 65 warning BT09A213 1 2 10 ...
Страница 31: ...2 SAFETY INFORMATION Safety signs and decal locations RAIL16SP00180FA 1 RAIL16SP00181FA 2 2 13 ...
Страница 32: ...2 SAFETY INFORMATION RAIL16SP00182FA 3 RAIL16SP00183FA 4 2 14 ...
Страница 47: ...3 CONTROLS AND INSTRUMENTS Mode on the display will switch to Bag Mode 1 RAIL16GEN0044AA 19 3 9 ...
Страница 94: ...4 OPERATING INSTRUCTIONS 4 10 ...
Страница 158: ...6 WORKING OPERATIONS 6 52 ...
Страница 260: ...7 MAINTENANCE 7 102 ...
Страница 270: ...8 TROUBLESHOOTING 8 10 ...
Страница 272: ...9 SPECIFICATIONS 9 2 ...