Mounting and commissioning
ProCalida® GT 3
19
5.2
Pre-assembling the brine/heating circuit manifold
Mounting segments
Take into account the position of the wall brackets when mount-
ing the segments (see chapter 4, page 11).
1.
Grease the O rings.
2.
Insert connection element into segments.
3.
Mount the fasteners. Hand-screw the nuts.
Mounting optional connection elements 30 mm/60 mm
Optional connection elements 30 mm/60 mm increase the distance
between two segments by 30 mm/60 mm.
Connection elements 30 mm/60 mm can be combined to increase
the distance between the segments.
1.
Grease the O rings.
2.
Insert connection element into segments.
3.
Mount the fasteners. Hand-screw the nuts.
Содержание ProCalida GT 3
Страница 14: ...Technical specifications 14 ProCalida GT 3 Fig 11 Pressure loss curves with flow meter 2 12 l min ...
Страница 15: ...Technical specifications ProCalida GT 3 15 Fig 12 Pressure loss curves with flow meter 5 42 l min ...
Страница 16: ...Technical specifications 16 ProCalida GT 3 Fig 13 Pressure loss curves with flow meter 35 70 l min ...
Страница 17: ...Technical specifications ProCalida GT 3 17 Fig 14 Pressure loss curves with flow meter 60 125 l min ...