![Afriso EURO-INDEX D0 Скачать руководство пользователя страница 29](http://html1.mh-extra.com/html/afriso-euro-index/d0/d0_operating-instructions-manual_2864879029.webp)
Mounting and commissioning
Bourdon tube, capsule, diaphragm,
spring diaphragm pressure gauges
29
7.6
Pressure tap piece
1.
Mount the pressure tap piece at a point with unobstructed flow
or steady measuring conditions.
2.
The hole for the pressure tap piece must be sufficiently large; it
is recommended to install a shut-off unit.
7.7
Measuring line
The measuring line connects the pressure tap piece and the pres-
sure gauge.
Select a measuring line with a sufficiently large inside diameter
to help avoid clogging.
Run the measuring line with a gradient. Provide a drain point at
the lowest point in the case of gases and a vent point at the
highest point in the case of highly viscous liquids.
For gases and liquids containing solid particles, install a separa-
tor/filter which can be separated from the system by means of a
shut-off unit during operation for emptying.
Construct and install the measuring line in such a way that it can
absorb all loads and stresses caused by expansion, vibration or
heat influences.