Operation 47
4510012 - REV F – 220621
Running Product
To run product through the GEN-S Steam Heat Shrink Tunnel, follow the procedure below.
Total Time Required Before Running Product:
•
At least 20 minutes
To Run Product:
Turn the System Main Power Switch on.
Ensure that the Blowdown Valve is closed.
Open the external water supply Valve to fill the Boiler. Make sure water is flowing freely
in the Water Line.
Turn the Boiler Control Power Switch on.
Blowdown Valve
(Closed)
AFM-4510012-00038-01
AFM-4510012-00041-01
System Main Power Switch
(On)
Boiler Controller
Power Switch
(On)
Sight
Glass
Pressure
Gauge
AFM-4510012-00042-01
AFM-4510012-00052-01
Содержание STC-WSN300-2M
Страница 1: ...WSN GEN S Steam Heat Shrink Tunnel User Guide ...
Страница 2: ...2 Abbreviations 4510012 REV F 220621 ...
Страница 8: ...8 Abbreviations 4510012 REV F 220621 ...
Страница 28: ...28 Introduction 4510012 REV F 220621 STC WSN600 2M GEN S Top View Front View Exit View Entry View ...
Страница 66: ...66 Troubleshooting 4510012 REV F 220621 ...
Страница 67: ...Electrical Schematics 67 4510012 REV F 220621 Electrical Schematics Complete System WSN GEN S ...
Страница 68: ...68 Electrical Schematics 4510012 REV F 220621 Boiler ...
Страница 72: ...72 Parts List 4510012 REV F 220621 Exploded Diagrams Stand Drawing Number YS130EX2 01 ...
Страница 74: ...74 Parts List 4510012 REV F 220621 Tunnel Drawing Number YS130EX2 02 ...
Страница 78: ...78 Parts List 4510012 REV F 220621 Boiler ...
Страница 79: ...Parts List 79 4510012 REV F 220621 Inside Boiler Electrical Cabinet ...
Страница 84: ...84 Technical Support 4510012 REV F 220621 ...