
18 Installation and Setup
Data Cable and Power Connections
Connect HMI, Touchscreen, and Conveyor before plugging into power. Make sure
power switch is set to “off” before plugging in. Do not “hot plug” any of the assemblies.
Brushdown hookups are located on the outfeed side, and any Feed (Timing) Screw
hookups should be located on the infeed side.
2060
Plug into
220VAC
Power
Switch
Brushdowns
2167
Timing
Screw
Содержание LX-100
Страница 1: ...Shrink Sleeve Label Applicator Model Number LX 100 User Guide ...
Страница 2: ......
Страница 4: ......
Страница 7: ...Safety 7 ...
Страница 35: ...Operation 35 Typical setup 2107 Heat Tunnel LX 100 TTO Timing Screw not shown Brush down Not shown Conveyor ...
Страница 45: ...Operation 45 Screen 13 X 1951 CUT LENGTH mm Jump to Screen 30 Press here to access keyboard ...
Страница 60: ...60 Print Reading Sensor Print Reading Sensor details 1406 ...
Страница 77: ...Schematic Diagrams 77 ...
Страница 96: ......
Страница 97: ......
Страница 98: ......