INSTALLATION INSTRUCTIONS CONTINUED                                                                                  

PAGE 3

 

3.  Measure up 34-

1/2

" (36" rail height) from the floor and mark a level,  

 horizontal line on the side of the post the Saddle Bracket (C) will be  

mounted.  Align the screw holes in the Saddle Bracket (C) with the  

 horizontal line marked on the post making sure the bracket is  

 centered on the post, and attach Saddle Brackets with #10 x 1” self  

 drilling screws (H). * Note:  Measure up 40 -1/2” for 42” height rail. * 

(An AFCO Tool will help with locating the brackets in this step)

 

(

Pre-drilling is recommended.)                                                                    

                 

4.  Locate pre-drilled cable baluster (K) and insert over the installed        

baluster connector on the Bottom Rail (B) with holes facing in line with 

the rail.  Install the Top Rail (A) on the baluster also making sure it is fully 

seated in place.  

A rubber mallet may be required to lightly tap the rail to fully seat on the 

baluster.

 

 
            

 

 

5.  Slide the Bracket Covers (D) on each end of the top tail (A)    

approximately 3 - 4 inward.   

 

Note:  A small piece of tape may be required to temporarily hold covers         

on top rail. 

 

6.   Slide the Bottom Brackets (E) on each end of the Bottom Rail (B) 

      with holes facing down and counter bore holes facing towards  

      baluster.  

 

             

7.  Set the assembled rail in place with Top Rail (A) placed in the Saddle 

Brackets (C) and the let the Bottom Rail (B) hang freely between the posts. 

   

Added temporary spacers the same thickness as the support block in-

stalled in step 3 placed under each end of the bottom rail will help to level 

the rail to install the bottom brackets. 

 

8.  Slide and hold the Bottom Brackets (E) centered, and firmly against the 

post.  Secure each bracket with self drilling screws (H). 

Note:  Screw holes are angled to make mounting brackets easier to install. 

 

An AFCO Tool will help with centering and locating the brackets in this 

step.

 (

Pre-drilling is recommended.)                                                                    

 

Содержание 175 Series

Страница 1: ...he appropriate hardware as needed for proper installation FOR A SUCCESSFUL INSTALLATION TOOLS REQUIRED x Drill bit 5 32 156 x Drill Bit 9 32 281 x Drill bit 29 64 453 x 1 8 hex wrench x 7 16 wrench x Drill with adjustable clutch recommended x Miter Saw with metal cutting blade x Level x Rubber mallet x Tape measure x Cable cutters x Grinder with cutoff wheel x Touch up paint NOTES x NOTE Cables fo...

Страница 2: ...ructure 4 Finish by sliding the base trim to the bottom of the post to cover the mounting flange 5 To install the post cap set post capital in place on top of the post and tap lightly with a rubber mallet to drive the post cap onto the post Silicone or water based caulking may be used to secure the post cap and base trim Note Cap installation step is typically completed after all rails have been i...

Страница 3: ...ed to lightly tap the rail to fully seat on the baluster 5 Slide the Bracket Covers D on each end of the top tail A approximately 3 4 inward Note A small piece of tape may be required to temporarily hold covers on top rail 6 Slide the Bottom Brackets E on each end of the Bottom Rail B with holes facing down and counter bore holes facing towards baluster 7 Set the assembled rail in place with Top R...

Страница 4: ...ends of the cable through all posts and support balusters starting at the holes drilled out to 9 32 3 Slide Line Fittings with required round black washers onto the cables while twisting in a clockwise motion until the fittings are fully seated in the end post Pull the bare ends to remove as much slack as possible Trim all ends of the ca ble sticking out of the fittings with a cutoff wheel and pre...

Отзывы: