Operating instructions EN
◼
SE-24
◼
01.06.2022
◼
V1.5
45
–66
8 Electrical installation of the SE-24 in the system
8.1 Connection to the power supply and the controller
The servo controller is connected to the 24V power supply and the 24V control supply.
A common reference potential is used (GND).
Connection to a higher level control system (PLC) is carried out - dependent on the
SE-24 model
– via digital inputs and outputs or a fieldbus system (Profibus DP,
EtherCAT, CANopen).
The SE-24 servo controller must be completely connected before the voltage supply
for the power and control electronics are turned on.
CAUTION
Do not mix up the voltage supply lines.
The complete motor connection is designed for poled DC voltage.
Mixing up the plus and the minus pole will lead to severe damage to
the electronics.
Содержание 50315434
Страница 1: ...Servo Controller SE 24 Operating Instructions Operating manual Copyright by Afag Automation AG ...
Страница 47: ...Operating instructions EN SE 24 01 06 2022 V1 5 47 66 Figure 17 Example of a circuit diagram of the SE 24 I O ...
Страница 65: ...Operating instructions EN SE 24 01 06 2022 V1 5 65 66 ...