
Mounting Instructions EN
◼
SE-Power FS
◼
01.06.2022
◼
V4.4
37
–50
Table 13:
Pin assignment [X9] SE-Power FS 3kVA und 6kVA
Pin No.
Denomination Value
Specification
1
L1
230...480VAC
±10%
50...60Hz
Conductor phase 1
2
L2
Conductor phase 2
3
L3
Conductor phase 3
4
ZK+
< 700VDC
Pos. DC bus voltage
5
ZK-
GND_ZK
Neg. DC bus voltage
6
BR-EXT
< 800VDC
Connection of external brake chopper
7
BR-CH
< 800VDC
Brake chopper connection for internal brake
chopper against BR-INT or external brake
chopper against ZK+
8
BR-INT
< 800VDC
Connection of internal brake chopper
(bridge to BR-CH when using the internal
chopper)
9
PE
PE
Connection ground conductor from mains
10
+24V
+24VDC ±20%
/ 1,0A
*)
Supply for control module and holding brake
11
GND24V
GND24
Reference potential supply
*)
Plus current consumption of a possibly connected holding brake and I/O’s
PHOENIX COMBICON
an [X9]
1
4
7
9
2
5
8
3
Versorgungsseitiger
Anschlussstecker
6
BR-CH
L1
L2
L3
PE
BR-INT
ZK-
BR-EXT
ZK+
GND24V
+24V
11
10
externer
Bremswiderstand
alternativ!
Figure 14:
Supply [X9] SE-Power FS 3kVA and 6kVA
Power
connector
PHOENIX COMBICON
an [X9]
external
brake chopper
alternative!