Compact
FLAT
SN 2 Mounting Gauge
8
Positioning the base rail
Determine the distances between the base rails.
The correct spacing dimensions of the base rails must be taken from the planning documents.
Place the mounting gauge according to the illustration and fix the spacer.
The adjusted mounting gauge can now be repositioned, with the spacer of base rail (1) being placed at base rail (3).
Apply the mounting gauge along the base rails several times so that the base rails are aligned parallel.
Place the two new base rails.
The mounting gauge is now set and can be used as a gauge for the project.