
2 Overview
AEC UPS IST7 10-30 KVA
User Manual
32
Fasten the communication wires to corresponding wiring bundling slot by cable ties, which is to ensure
wiring in order and avoid blocking the ventilation holes.
After ensure the wire connection are all right, fill the empty party with insulation fireproofing mud.
Reinstall the bottom wire seal plate, the wiring is finished.
3.4.3 Install Battery Cabinet
Important safety rule
Do not open or disassemble the battery, for the inner electrolyte is harmful for eyes. If contacting the
electrolyte with careless, please wash the contact part with plenty water and go to hospital immediately.
To avoid electric shock and short circuit while replacing battery, pay attention to following precautions.
Do not wear watch, ring or other metal decorations.
Use the tool with insulation handle.
Do not put any tool or metal object on the battery.
Keep the battery far away from fire, no smoking.
Battery cabinet installation procedure
The assemble for the external battery should be performed by professional technicist.
Besides the UPS, it is necessary to equip battery and battery cabinet. The installation procedure for
battery cabinet is as follows.
Connect the wires of external batteries properly.
Before connecting, please ensure that the breaker of battery cabinet is OFF to the terminal.
Содержание IST7 20kVA
Страница 1: ...User Manual AEC UPS IST7 The NEW high frequency Three Phase 10kVA 30kVA...
Страница 2: ......
Страница 8: ......
Страница 28: ...2 Overview AEC UPS IST7 10 30 KVA User Manual 20 3 2 Installation Preparation 3 2 1 Installation Tools Tools...
Страница 86: ......