SOLED_IM_ITA-ENG - Rev.07 of 19/07/18
Page 3 of 4
SOLED
Made in Italy
ISTRUZIONI DI MONTAGGIO E
MANUTENZIONE
MOUNTING AND MAINTENANCE
INSTRUCTION
B
Space of the upper
frame
Pic. 2
Pic. 1
Pic. 5
Pic. 4
D
A
E
MOUNTING AND MAINTENANCE
Open the upper frame of the luminaire unscrewing the 3
screws (A
– Pic. 1).
Pass the mains cable through the post-top (B
– Pic. 2) and
then through the membrane (C
– Pic. 2). Punch the
membrane directly with the mains cable and connect its to
the mains connector (D
– Pic. 4).
Class I luminaire
: In class I use a 3 poles cable (Line +
N Earth). Connect the green-yellow wire to the
terminal.
Class II luminaire
: In class II use a 2 poles cable (Line +
Neutral).
In both case the used cable has to be in compliance to the
installation in double insulation.
The luminaire has to be powered with a cable with nominal
diameter between 7mm and 13mm with maximum section
of 2.5mm
2
.
Block in position the mains cable tightening it to the cable
holder (E
– Pic. 4).
In case the luminaire is equipped with PLM, annotate the
serial number of the control device.
Orientate correctly the luminaire (see Pic. 6) and block it to
the pole with the 4 grub screws (L
– Pic. 3). Tighten the
grub screws using a set screw wrench of 4mm applying a
twisting moment of 8Nm.
When it is necessary, it is possible take away the gear tray.
Disconnect first the mains connector (H
– Pic. 5) then the
LED connector (G
– Pic. 5) and finally loosen the screws (I
– Pic. 5) that block the gear tray.
Once finished the operation, reinsert in right position the
gear tray, block it screwing the screws (I), connect first the
LED connector (G) and finally the mains connector (H).
To close the luminaire, place correctly the upper frame, as
in Pic. 3.
Fix the upper frame tightening the 3 screws (A
– Pic. 1) up
to the complete closing.
G
H
I
I
C
Pic. 3
Pic. 6
Pay attention to the SIDEWALK sign
on the optic
L