![AE AIR50-2230A Скачать руководство пользователя страница 69](http://html.mh-extra.com/html/ae/air50-2230a/air50-2230a_operation-manual_2859399069.webp)
AIR50-2230A Operation Manual
Project Maintenance Process
47
13
Project Maintenance Process
13.1
Cleaning of Manipulator
To ensure the long-term operation of robot, the manipulator shall be cleaned
every 960 h or 3 months (whichever comes first) according to the following
process:
1.
Adjust the robot to the calibration state.
2.
To prevent the hazards, turn off the power, hydraulic, and pneumatic
sources connected to the robot.
3.
Clean the manipulator with the vacuum cleaner or wipe it with a cloth.
4.
After all safety conditions are met, conduct the follow-up work of
manipulator.
Warning
◼
Do not apply the water jet on the manipulator, especially the joints and
seals.
◼
Do not clean the manipulator with compressed air.
◼
Do not remove any protector of manipulator.
◼
Do not clean the manipulator with solvent.
13.2
Check and Repair of Cable
To ensure the long-term operation of robot, the manipulator cable shall be
checked every 1,920 h or 6 months (whichever comes first).
Содержание AIR50-2230A
Страница 2: ...AIR50 2230A Operation Manual V 1 4 ...
Страница 21: ...AIR50 2230A Operation Manual Catalogue iii Appendix B Table of screw strength and tightening torque Nm 75 ...
Страница 22: ......
Страница 98: ......