10
EKI-9226G Series User Manual
2.4
Verifying Switch Operation
Before installing the device in a rack or on a wall, power on the switch to verify that
the switch passes the power-on self-test (POST). To connect the cabling to the power
source see “Power Supply Installation” on page 16.
At startup (POST), the System LED blinks green, while the remaining LEDs are a
solidy green. Once the switch passes POST self-test, the System LED turns green.
The other LEDs turn off and return to their operating status. If the switch fails POST,
the System LED switches to an amber state.
After a successful self-test, power down the switch and disconnect the power cabling.
The switch is now ready for installation on its final location.
2.5
Installing the Switch
2.5.1
Rack-Mounting
1.
Align the rack mount brackets with the holes on the switch.
2.
Secure the rack mount brackets with the provided screws.
Figure 2.1 Installing the Rack Mount Brackets
3.
Align the switch with the posts on the rack cabinet.
4.
Secure the switch.
Figure 2.2 Installing the Switch
LNK/ACT
26
25
25
26
23
24
21
22
19
20
17
18
15
16
13
14
11
12
9
10
7
8
5
6
3
1
4
2
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
ALARM
SYS
PWR1
PWR2
Reset
EKI-9226G
LNK/ACT
26
25
25
26
23
24
21
22
19
20
17
18
15
16
13
14
11
12
9
10
7
8
5
6
3
1
4
2
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
ALARM
SYS
PWR1
PWR2
Reset
EKI-9226G
Содержание EKI-9226G Series
Страница 1: ...User Manual EKI 9226G Series 6xRJ45 20xSFP Port Full Gigabit L2 Managed Switch ...
Страница 14: ...Chapter 1 1Product Overview ...
Страница 19: ...Chapter 2 2Switch Installation ...
Страница 34: ...Chapter 3 3Configuration Utility ...
Страница 39: ...Chapter 4 4Managing Switch ...
Страница 167: ...Chapter 5 5Troubleshooting ...