
ER75i v2
•
For every cables we recommend to bind the bunch, we recommend for this use:
–
Length of the bunch (combination of power supply and data cables) can be maxi-
mum 1.5 m. If the length of data cables exceeds 1.5 m or in the event of, the cable
leads towards the switch – board. We recommend installing over – voltage protec-
tors (surge suppressors).
–
With data cables they mustn’t carry cables with reticular tension
∼
230 V/50 Hz.
Figure 13: Cable routing (plastic)
Figure 14: Cable routing (metal)
•
Sufficient space must be left in front of individual connectors for handling of cables,
Figure 15: Space in front of connectors (plastic)
Figure 16: Space in front of connectors (metal)
•
For correct function of the router we recommend to use in the switch- board earth- bonding
distribution frame for grounding of power supply of router, data cables and antenna.
13
LUCOM GmbH — Flößaustr. 22a — 90763 Fürth — Tel.: +49 911/ 957 606 00 — E-Mail: [email protected] — www.lucom.de
www
.lucom.de