The following instructions should be followed for IPSCM-RM installations: 

 

A ferrite is included if there is concern over line performance. Wrap Cat 5 cable around ferrite once and 

clamp shut.  
 

IPSCM-RM-CB Assembly for Suspended Ceilings 
1. Align IPSCM-RM-CB bridge on the tile such that the support legs end at the tile edges and mark 
along the round section; rotate bridge 90˚ to mark remainder of hole.  Use caution when handling 
the bridge as it contains sharp edges. 
2. Cut ceiling tile along the marked circle. 
3. Place the IPSCM-RMD speaker-only assembly on flat surface, magnet side up. 
4. Center ceiling tile over the IPSCM-RMD speaker. 
5. Place the IPSCM-RM-CB bridge over the baffle assembly with two studs of the IPSCM-RMD baffle 
running through the two small oval holes of the bridge. (see Figure “A”) 
6. Secure IPSCM-RMD assembly, tile and IPSCM-RM-CB bridge together with the two #8-32 nuts 
provided in the bag attached to the speaker magnet. (see Figure “A”) 
7. Attach included cable assembly to the speaker blade terminals. 
8. Install back box (IPSCM-RM-BB) if necessary, per instructions in next section. 
9. Tie off the unit to the building structure if required using the straps on the back box, then place 
entire assembly into ceiling and run speaker cable to location of speaker with circuit board 
10. Repeat steps 1-6 for the IPSCM-RMIP speaker with control board.   
11. Screw the other end of the speaker cable into the two available speaker terminals on connector 
J5 of the control board. (see Figure “B”)   
12. Complete the Ethernet cable run to the IPSCM-RMIP with the control board. 
13. Install back box (IPSCM-RM-BB) if necessary, per instructions in next section.   
14. Complete any additional wiring for accessories, then connect the Ethernet cable to Ethernet jack 
J3 on the control board (see Figure “B”).  Secure IPSCM-RM-BB back box if used, tie off unit to 
building structure if required using straps on the back box, then place entire assembly into ceiling. 

 

                                        

 

 

 

 

 Figure A 

 

 

 

 

  