• The display should be located approximately 160 cm (63″) above the ground for
ease of use and operation. An elevated mounting position is permitted if easy
access to the display is provided. Viewing the display using a ladder, an aerial
platform or the equivalent is acceptable.
• Minimum clearances for each inverter must be observed.
• If the inverter contains the optional ADU, ensure that the alarm signal can be
easily heard and allows for proper follow-up.
☞
Important
Do not impair or block the heat sink cooling fins. Never install the units above
one another. Do not cover the cooling fins of the heat sink as this might cause
overheating of the inverter and may void the warranty.
Heatsink cooling fins
Figure 4‑2. Inverter cooling fins
MOUNTING THE UNIT
The wall mount bracket included with the inverter can be used for installation on a
concrete wall or a metal framework. Before mounting the inverter, ensure that the
wall can handle the weight of the inverter(s).
Advanced Energy
4‑6
Installing
570-1003552-05A
Содержание AE 3TL 1000 Series
Страница 2: ......
Страница 12: ...Advanced Energy xii 570 1003552 05A List of Tables...
Страница 14: ...Advanced Energy xiv 570 1003552 05A List of Figures...
Страница 26: ...Advanced Energy 1 12 Safety and Product Compliance Guidelines 570 1003552 05A...
Страница 64: ...Advanced Energy 4 28 Installing 570 1003552 05A...
Страница 86: ...Advanced Energy 6 4 Operating the Arc Fault Detection Unit 570 1003552 05A...
Страница 92: ...Advanced Energy 7 6 Data Monitoring and Controls 570 1003552 05A...
Страница 110: ...Advanced Energy 9 14 Troubleshooting and Solar Energy Technical Support 570 1003552 05A...
Страница 116: ...Advanced Energy A 6 Specifications 570 1003552 05A...
Страница 118: ...Figure 11 2 AE 3TL mechanical diagram Advanced Energy B 2 System and Mechanical Diagrams 570 1003552 05A...
Страница 120: ...Advanced Energy B 4 System and Mechanical Diagrams 570 1003552 05A...