Commissioning
Version:1.3
GSS0608
Page
55
of
72
8.2 System start
8.2.1 System start for EMS operating mode
1. Switch on the main switch.
2. Turn the key switch on the SRC4310 to ON. The LEDs on the SRC4310 switch from red to
green when power is requested in or out of the battery.
3. Switch on the two fuses F10 (air-conditioning system) and F11 (power supply for additional
devices) (next to each other).
4. Close the two system doors.
5.
The SRC1420 and air-conditioning system start automatically when switched on.
Note
: After shutting down the system, briefly press the START button on the SRC1420 to
restart. The LEDs start to flash. After approx. 3 minutes the system is ready for operation
again.
6.
Set the desired application types and parameters via the apps.
Please note the documentation for the StoraXe Machine Interface
(
ADS-TEC EMS_StoraXe Machine Interface).
7. ADS-TEC EMS takes over the control of the system.
8.2.2 System start for Master operating mode
1. Switch on the main switch.
2. Turn the key switch on the SRC4310 to ON. The LEDs on the SRC4310 switch from red to
green when power is requested in or out of the battery.
3. Switch on the two fuses F10 (air-conditioning system) and F11 (power supply for additional
devices) (next to each other).
4. Close the two system doors.
5.
The SRC1420 and air-conditioning system start automatically when switched on.
Note
: After shutting down the system, briefly press the START button on the SRC1420 to
restart. The LEDs start to flash. After approx. 3 minutes the system is ready for operation
again.
6. The system waits for commands from the customer control via Modbus.
Содержание StoraXe PowerBooster GSS0608
Страница 1: ...StoraXe PowerBooster Compact storage system GSS0608 ...
Страница 4: ......
Страница 14: ...Preliminary information Page 10 of 14 GSS0608 Version 1 3 6 Bottom view of unit ...
Страница 15: ...Preliminary information Page 11 of 14 GSS0608 Version 1 3 7 Checklist for commissioning ...
Страница 16: ...Preliminary information Page 12 of 14 GSS0608 Version 1 3 ...
Страница 18: ...Preliminary information Page 14 of 14 GSS0608 Version 1 3 9 Appendix Extract of the electrical diagram ...
Страница 21: ......
Страница 22: ......
Страница 118: ......
Страница 120: ......
Страница 121: ......
Страница 122: ......
Страница 123: ......
Страница 124: ......
Страница 125: ......
Страница 126: ......
Страница 127: ......
Страница 128: ......
Страница 129: ......
Страница 138: ......
Страница 139: ......