Getting Started
19
MCM-100/102
2 Getting Started
2.1 Unpacking Checklist
Before unpacking, check the shipping carton for any damage. If
the shipping carton and/or contents are damaged, inform your
dealer immediately. Retain the shipping carton and packing
materials for inspection. Obtain authorization from your dealer
before returning any product to ADLINK. Ensure that the fol-
lowing items are included in the package.
MCM-100/102 unit
DIN rail brackets
Wall mounting kit
Screw pack for DIN rail, wall mounting, and storage fixing
Quick Start Guide
2.2 Connecting DC Power
Active DC power sources must comply with LPS and SELV cir-
cuits with no energy hazard, as well as the following.
IEC 60950-1:2005+A1:2009+A2: 2013
Output voltage: 6 to 36VDC
Output current: 4.2 to 0.7A minimum
Tma: 50°C min.
The DC power input connector of the MCM-100/102 utilizes V+, V-
and chassis ground pins, and accepts input voltage as shown pre-
viously.
2.3 DIN Rail Mounting
The MCM-100/102 controller is shipped with wall-mounting brack-
ets and accessory screws, with mounting procedures as follows.
1. Prepare the DIN rail mounting bracket and 2 M4-F head
screws.
WARNING:
Before providing DC power to the MCM-100/102, ensure the
voltage and polarity provided are compatible with the DC input.
Improper input voltage and/or polarity can be responsible for
system damage.
Содержание MCM-100
Страница 6: ...vi Preface Leading EDGE COMPUTING This page intentionally left blank...
Страница 14: ...xiv List of Tables Leading EDGE COMPUTING This page intentionally left blank...
Страница 16: ...xvi List of Figures Leading EDGE COMPUTING This page intentionally left blank...
Страница 25: ...Introduction 9 MCM 100 102 Figure 1 3 MCM 100 Right Side View Figure 1 4 MCM 102 Right Side View...
Страница 27: ...Introduction 11 MCM 100 102 Figure 1 7 MCM 100 Right Side Panel I O Figure 1 8 MCM 102 Right Side Panel I O...
Страница 34: ...18 Introduction Leading EDGE COMPUTING This page intentionally left blank...
Страница 37: ...Getting Started 21 MCM 100 102 161 58 150 38 134 3 118 22 113 95 60 6...
Страница 44: ...28 Getting Started Leading EDGE COMPUTING This page intentionally left blank...
Страница 50: ...34 Driver Application Installation Leading EDGE COMPUTING This page intentionally left blank...
Страница 64: ...48 Operation Leading EDGE COMPUTING This page intentionally left blank...
Страница 85: ...BIOS Setup 69 MCM 100 102 A 2 8 Network Stack Configuration Network Stack Enables disables UEFI network stack...
Страница 87: ...BIOS Setup 71 MCM 100 102 SEMA Features Shows features supported by the SEMA version...
Страница 89: ...BIOS Setup 73 MCM 100 102 Power Consumption Shows current input current and power as well as system volt ages...
Страница 90: ...74 BIOS Setup Leading EDGE COMPUTING Flags Shows BMC flags with exception codes...
Страница 91: ...BIOS Setup 75 MCM 100 102 Power Up Lists Power Up Watchdog status...
Страница 92: ...76 BIOS Setup Leading EDGE COMPUTING A 2 10 Miscellaneous OS Selection Allows selection of active OS...
Страница 100: ...84 BIOS Setup Leading EDGE COMPUTING This page intentionally left blank...
Страница 116: ...100 Important Safety Instructions Leading EDGE COMPUTING This page intentionally left blank...