![Adisa NEO FIRE 120 Скачать руководство пользователя страница 61](http://html.mh-extra.com/html/adisa/neo-fire-120/neo-fire-120_technical-manual-of-installation-use-and-maintenance_2851533061.webp)
NEO FIRE – Technical Manual
61
17
THE BOILER START-UP
17.1
Before the start-up
The first start-up is a very important operation on which the future effectiveness and reliability of the
equipment can depend. For this reason, it must be carried out by our own Official Technical Assistance Service.
Before the start-up, it is important to check that:
The installation is in accordance with this manual’s instructions and with the local regulations.
The installation is full of water and vented of air.
The static water pressure of the installation (when cold) is between 1 bar minimum and 6 bar maximum.
The water circulation pumps operate in the correct direction.
The water cut-off valves are open.
The gas type and pressure correspond to the ones indicated for that boiler (see the boiler identification plate).
The gas valves are open, the air of the gas installation vented and there are no gas leaks.
The electric connections are correct (220/230 V, 50 Hz, single phase, ground) so that the boiler is electrically
supplied.
The controls are set so as to require heat from the system.
Instruments required for the start-up:
A manometer to check the combustion chamber pressure drop, the gas injectors pressure and the inlet gas
pressure. We recommend using two digital manometers (or U-shaped manometers with water columns).
A flue electronic analyser to measure CO,
CO
2
, O
2
and the flues temperature.
Ammeter/electrical tester.
Ionization electrode, ignition electrode, fuses, screws, nuts.
17.2
Gas pressure switch
Model
Gas Pressure Switch
NEO FIRE
Adjustment
(mbar)
Type
Image
OFF
ON
80
10
Blind cover,
open the cover
to adjust
10
+/- 1
12,5
+/- 1
120-360
15
Transparent
cover, fixed to
the side of the
gas shut-off
valve
15
+/- 1
17,5
+/- 1
450-900
15
Transparent
cover,
connected to a
pipe to facilitate
access
15
+/- 1
17,5
+/- 1
Содержание NEO FIRE 120
Страница 1: ...TECHNICAL MANUAL OF INSTALLATION USE AND MAINTENANCE 07 2020 ...
Страница 6: ...NEO FIRE Technical Manual 6 4 BOILER GENERAL VIEW DESCRIPTION OF THE COMPONENTS NEO FIRE 80 280 ...
Страница 7: ...NEO FIRE Technical Manual 7 NEO FIRE 360 900 ...
Страница 9: ...NEO FIRE Technical Manual 9 NEO FIRE 80 NEO FIRE 120 160 ...
Страница 10: ...NEO FIRE Technical Manual 10 NEO FIRE 200 280 NEO FIRE 360 720 ...
Страница 34: ...NEO FIRE Technical Manual 34 11 1 Electric drawing NEO FIRE 80 720 ...
Страница 35: ...NEO FIRE Technical Manual 35 11 2 Electric drawing NEO FIRE 810 900 ...
Страница 37: ...NEO FIRE Technical Manual 37 Electric drawing 1 Boiler with 3 heating circuits ...
Страница 41: ...NEO FIRE Technical Manual 41 System drawing 1 Boiler and Domestic Hot Water DHWS ...
Страница 58: ...NEO FIRE Technical Manual 58 System drawing D H W and heating circuit 11 11 ...
Страница 59: ...NEO FIRE Technical Manual 59 System drawing of an old installation heating circuit 11 ...
Страница 70: ...NEO FIRE Technical Manual 70 18 4 Position of probes and sensors ...