Содержание B08LGR7RBF
Страница 2: ...1 Work Schematic...
Страница 3: ...NOTE Users can complete the installation by PCB silk screen and component listing...
Страница 4: ...2 Component Description 1 3pcs 1K Metal Film Resistor 2 1pcs 2 2K Metal Film Resistor...
Страница 6: ...3 Installation Steps 1 Install Board CTR 30A...
Страница 7: ...Step 1 Install 3pcs 1K Metal Film Resistor on R2 R4 R6...
Страница 11: ...Step 5 Install 3pcs 47uF 16V Electrolytic Capacitor...
Страница 13: ...Great CTR 30A has been installed completed...
Страница 14: ...2 Install Board CTR 30B...
Страница 15: ...Step 7 Install 3pcs 1K Metal Film Resistor on R2 R4 R6...
Страница 16: ...Step 8 Install 3pcs 10K Metal Film Resistor on R1 R3 R5...
Страница 17: ...Step 9 Install 18pcs LED...
Страница 18: ......
Страница 19: ...Step 10 Install 3pcs 47uF 16V Electrolytic Capacitor Step 11 Install 3pcs TO 92 S9014 Transistor...
Страница 20: ...Step 12 Connect 5V to CTR 30A and CTR 30B Preliminary welding success if LEDs are blinking automatically...
Страница 22: ...4 Install Board CTR 30C...
Страница 24: ......
Страница 26: ......
Страница 28: ...Congratulations...