Installation Guide

Содержание SmartDC

Страница 1: ...SmartDCTM V2 Installation Guide...

Страница 2: ...Notice V05 2017 04 10 Table of contents Security 3 Specifications 4 Dimensions 5 Exterior preview of the station 6 Interior preview of the station 7 Typical installation 8 Site preparation 9 Installin...

Страница 3: ...s and installed by a certified electrician 5 Communicate with a certified contractor certified electrician or trained installer to ensure compliance with local building code regulation security standa...

Страница 4: ...tion bloc 350 MCM max for the phases 3 0 max for the neutral Nominal voltage supply Three phase 480Y 277V must be protected by a 100A three phase over current protection device Maximum power consumpti...

Страница 5: ...L RIGHTS RESERVED Information and Specifications Contained in this Document are Subject to Change Amendments and Additions at any Time Without Notice V05 2017 04 10 Dimensions 200cm 79po 83cm 33po 119...

Страница 6: ...ment are Subject to Change Amendments and Additions at any Time Without Notice V05 2017 04 10 Exterior Preview of the Station A B D E F C G J I H A Locking door handle B Start button C Stop button D D...

Страница 7: ...ions Contained in this Document are Subject to Change Amendments and Additions at any Time Without Notice V05 2017 04 10 Interior Preview of the Station A Power cable access B Three phase and neutral...

Страница 8: ...t any Time Without Notice V05 2017 04 10 Typical Installation A Electrical equipment cabinet metering protection and distribution B Power cable three phase 480Y 277 Volts 100A NEUTRAL GROUND C SmartDC...

Страница 9: ...nd stabilized as required so that it is not affected by freezing 5 An electric conduit of appropriate diameter based on the electric wire gauge must bring the electric cable under the station s perime...

Страница 10: ...ncrete Slab 1 It is recommended to use stainless steel inch 6 4 mm concrete wedge anchors not included 2 Drill holes in the concrete slab of diameter and depth appropriate for the anchors according to...

Страница 11: ...onto the Base 1 Remove the access plate to allow the passage of the power cable 2 Place the station onto its base making sure to pass the power cable through the access hole 3 Punch a hole in the acc...

Страница 12: ...ent are Subject to Change Amendments and Additions at any Time Without Notice V05 2017 04 10 1 Connect the three conductors into the three phase power terminal 2 Connect the NEUTRAL conductor into the...

Страница 13: ...ree phase 480Y 277V voltage is within specifications Once the station is on 1 Close and lock the charging station s casing door Putting the station into service 1 After the station has been turned on...

Страница 14: ...UST BE PERFORMED BY ADD NERGIE It consists of 1 Cleaning or replacing the cooling system filters It is important to maintain proper airflow inside the station to adequately cool the power modules 2 In...

Страница 15: ...denergie ca Installation or commissioning questions 877 505 2674 ext 203 Add nergie Technologies Inc Eastern office 2327 Versant Nord Boulevard office 120 Qu bec QC G1N 4C2 CANADA Central office 7420...