4601 I-V Meter Operation Manual
1.6.1 Environmental Conditions
1-12
Figure 1-6 Operating Environment
NOTE:
Warm-up Time
Allow the 4601 to warm up for at least 60 minutes after turning on the power to ensure the specified
accuracy of the 4601.
After warm-up, execute zero measurement to secure precise measurement results.
For more information, refer to Section 5.3.6, "Zero Measurement."
Vibration
Direct sunlight
Corrosive
gas
Front
• Avoid operation in these areas.
• Use a noise-cut filter when there is a large amount
of noise riding on the power line.
Dust
• Keep the rear panel more than 10 centimeters away
from the wall
Front
• Do not position the 4601 in a position with the
rear panel facing down.
Line Filter
Содержание 4601 I-V Meter
Страница 2: ......
Страница 8: ......
Страница 14: ......
Страница 18: ......
Страница 70: ...4601 I V Meter Operation Manual 3 4 1 Menu Structure 3 18...
Страница 80: ......
Страница 92: ......
Страница 129: ...4601 I V Meter Operation Manual 5 6 1 Synchronous Operation 5 37...
Страница 146: ......
Страница 182: ......
Страница 230: ......