5.0 Maintenance
This section covers the maintenance procedures to maintain RELIANCE IL.
WARNING
Make sure that the power to the series circuit is OFF when you carry out maintenance.
CAUTION
Do not carry out any action on the fixture unless you have read and understood all the information in the
Section.
Important
Only switch off the system or execute changes at the system that restrict functionality completely or partially with
prior authorization of the responsible traffic control representative.
NOTICE
An Individual Light Control and Monitoring system (ILCMS) can be integrated into an Advanced Surface Movement
Guidance and Control System (A-SMGCS) that is supposed to fulfill safety-related functions. These safety requirements
must be preserved.
5.1 Importance of Maintenance Requirements for Warranty Claims
ADB SAFEGATE will in the following cases decline any responsibility, nor will it accept any warranty claims:
•
If the system has been handled negligently, contrary to the safety and work instructions currently applying
•
In the event of inadequate maintenance, non-compliance with the recommendations given here, or inexpertly executed
repairs performed by untrained or inadequately equipped personnel
•
If the system is used for other than its intended purpose
•
In the event of modifications to the system that have not been carried out by authorized specialist personnel
5.2 General Maintenance Remarks
An airfield’s lighting system requires regular maintenance work.
Note
The operator is obligated, not least under the DIN EN 61821 standard, to keep these systems in a fully functional state
by means of the maintenance routines specified by the manufacturer.
Note
Maintenance work thus directly influences the safety and functional efficiency of the system concerned. Maintenance
work must be carried out only by specialist personnel who possess experience with series circuits, high voltage and
lighting systems, in due compliance with the relevant safety regulations.
The tables provide an overview of the preventive maintenance work required when the system is operational.
Depending on the environmental conditions involved, different time intervals may also be necessary in order to assure
maximized availability for each system.
UM-5005, Rev. 004, 2020/08/06
81
Copyright
©
ADB SAFEGATE, All Rights Reserved
Содержание RELIANCE Intelligent Lighting Platform III
Страница 1: ...RELIANCE Intelligent Lighting Platform III User Manual UM 5005 Rev 004 2020 08 06 ...
Страница 2: ......
Страница 10: ...RELIANCE Intelligent Lighting List of Figures x Copyright ADB SAFEGATE All Rights Reserved ...
Страница 12: ...RELIANCE Intelligent Lighting List of Tables xii Copyright ADB SAFEGATE All Rights Reserved ...
Страница 18: ...RELIANCE Intelligent Lighting Safety 6 Copyright ADB SAFEGATE All Rights Reserved ...
Страница 52: ...RELIANCE Intelligent Lighting Introduction 40 Copyright ADB SAFEGATE All Rights Reserved ...
Страница 56: ...RELIANCE Intelligent Lighting Installation 44 Copyright ADB SAFEGATE All Rights Reserved ...
Страница 118: ......