33
Product description
4.5.7 LED displays and buzzer sound matrix
With flashing LED 1, the following modes are carried out in accumulator operation:
LED 1
LED 2
LED 3
LED 4
Buzzer
Control condition Measures
-
-
-
-
-
Control off:
No backflow monitoring
Connect control to mains
During long-lasting mains
voltage failure, control switches
off automatically. The operating
seal can be opened manually.
(
chapter 6.2)
On
-
-
-
-
Normal operation
-
Flashes
-
-
-
-
Accumulator operation
Connect control to mains
On
-
-
Flashes
-
Accumulator check with
subsequent charging
operation during
switching-on process
Accumulator test lasts approx.
25 sec., the reference run
starts as soon as the accumu-
lator has reached the nominal
voltage. If reference run does
not start within 10 min., a fault
is signalled.
On
-
-
Flashes
every 4
sec.
every 2
sec.
Accumulator fault
(
chapter 9.2)
On
-
-
Flashes
every 8
sec.
every 30
sec.
Accumulator warning
(accumulator loses
capacity)
Exchange accumulator
(
chapte. 9.3)
On
-
Flashes
-
-
Automatic self-test in
normal operation
or
manual operating test by
pressing button 2
No measures required
On
-
On
-
Permanent
tone
Manual operating test,
operating seal closed
Stop manual operating test by
pressing button 2 once.
On
On
Every sec.
Motor fault,
operating seal cannot
drive in defined final
position or drive
defective
(
chapter 9.2)
On
On
On
-
Permanent
tone
Mains operation,
backflow; operating seal
closed
Wait until backflow is over.
Warning sound can be switched
off by pressing button 1 once.
On
On
On
Every sec.
Mains operation,
backflow, motor fault at
the same time
Close emergency seal until
backflow is over, clear motor
fault (
chapter 9.2)
Flashes,
buzzer
tone in
parallel
Flashes,
buzzer
tone in
parallel
Interval
tone every
30 sec.,
sound
signal 2
sec.
Control is in stop mode
(
chapter 4.5.4 )
Содержание Quatrix-K 620368
Страница 57: ...57 Commissioning and operation I...
Страница 71: ...71 Operator manual Period from to Inspection and maintenance works Works Date Signature...
Страница 72: ...72 Operator manual Period from to Repair and servicing works Works Date Signature...
Страница 73: ...73 Operator manual Period from to Checks Works Date Signature...
Страница 74: ...74...
Страница 75: ...75...