2.4.2 Heavy Duty Installations

1.

 

Excavate area 60” wider and 12” 
deeper than separator; this allows for a 
full 12” concrete encasement

2.

 

Check level of unit and inverts of inlet/

outlet pipes

3.

 

Pour concrete to level of inlet/outlet pipes

4.

 

Connect inlet/outlet pipes - pipes 

should be resistant to hydrocarbons. 

Flexible couplings will be required as 
inlet/outlet pipes are metric dimensions

5.

 

Inlet pipes should be installed with 
as few bends and slopes as possible 
to prevent blockages and reduce 
turbulence of incoming wastewater

6.

 

Install extension shaft - cut to required 

height, place seal in lowest notch of 
remaining section. Grease seal and 

tank collar with acid-free grease to 

ensure watertight seal.

7.

 

Install wiring conduit for alarm system 
(if used)

8.

 

Continue backfilling up to 8” (200mm) 

below top of access shaft

9.

 

Install reinforcement, form and pour 

concrete load distribution plate - 8” 
thick and extending 14” around shaft in 

all directions (see below for details)

10.

 

Install cover, frame and concrete 
adaptor plate to ensure it is held 
securely in place

11.

 

Install alarm sensors (if used)

2.4.1 Light Duty Installations

1.

 

Excavate area 60” wider and 12” 
deeper than the separator; this allows 
for a 12” aggregate base compacted 

to Proctor density 97%.

2.

 

Check level of unit and inverts of inlet/

outlet pipes

3.

 

Backfill around unit to the level of 
inlet/outlet pipes (backfill should be 
2-16mm sand/gravel); take care when 
compacting fill not to damage separator

4.

 

Connect inlet/outlet pipes - pipes 

should be resistant to hydrocarbons. 

Flexible couplings will be required as 
inlet/outlet pipes are metric dimensions

5.

 

Inlet pipes should be installed with 
as few bends and slopes as possible 
to prevent blockages and reduce 
turbulence of incoming wastewater

6.

 

Install extension shaft (if used) - cut to 

required height, place seal in lowest 
notch of remaining section. Grease seal 

and tank collar with acid-free grease to 

ensure watertight seal.

7.

 

Install wiring conduit for alarm system 
(if used)

8.

 

Recheck levels

9.

 

Continue to backfill and compact

10.

 

Install cover with 4” deep concrete 

collar to ensure it is held securely in 
place

11.

 

Install alarm sensors (if used)

2.4 Installation

Load distribution plate Ø 61.0”/33.5”x8.0” 
(1550/850x200mm)

Concrete: 5,000psi (35MPa)

Concrete Steel: #4 rebar (10M)

Concrete Cover: 1.2” (30mm) 

35 x #4 rebar @ 3.15” 

(10M @ 80mm)

stirrups

Typical reinforcement plan

 

Ø

 61.0” (1,550mm) 

Ø

 33.5” (850mm) 

8.0” (200mm) 

13.75”

(350mm) 

13.75”

(350mm) 

6.0”

(150mm)

4.5”

(115mm)  

Cross section

 

Содержание Oleopator P N 3/950

Страница 1: ...oil and sediment separator system ACO Construction Building Products Oleopator P Oil Water Separator Operating Guide 1 Installation 2 Initial set up commissioning 3 Operation 4 Maintenance ACO Enviro...

Страница 2: ...m inflow volume GPM at which point additional inflow bypasses the separator and diverts directly to the outlet pipe Typically most pollutants are washed into the separator during the initial flow so e...

Страница 3: ...___________________________________________________________7 3 Initial Set up 3 1 Prior to filling the system________________________________________________________________________________8 3 2 Filli...

Страница 4: ...r complying with the following points Only operate the separator according to regulations and in proper condition Ensure that function of protection devices is not impaired Adhere to a scheduled maint...

Страница 5: ...n Oleopator separators are intended for in ground installation Care must be taken to determine correct installation to take into account site loadings and traffic patterns Details are provided for lig...

Страница 6: ...3 670 1 78 45 2 75 70 5 90 150 N 3 950 1 78 45 2 75 70 5 90 150 NS6 660 1 57 40 2 56 65 5 71 145 NS6 1210 1 57 40 2 56 65 5 71 145 NS10 1080 1 97 50 2 95 75 6 10 155 Installation situation Super eleva...

Страница 7: ...tions 1 Excavate area 60 wider and 12 deeper than the separator this allows for a 12 aggregate base compacted to Proctor density 97 2 Check level of unit and inverts of inlet outlet pipes 3 Backfill a...

Страница 8: ...er of the LGA Test report Volume of separator and sludge trap Maximum storage volume and maximum thickness of light oil layer Maximum permissible sludge thickness 3 2 2 Filling procedure 1 Ensure inle...

Страница 9: ...nding ground When any of these events occur a signal is sent to the building management system which can send out audio visual and SMS alerts to ensure maintenance can be carried out before the separa...

Страница 10: ...y and clean separator as required see disposal requirements Remove any coarse floating material Inspect all components of alarm system if used Immediately rectify any faults identified Report findings...

Страница 11: ...e units for clean back up spare coalescence unit The dirty coalescence unit can be stored in a water filled container until to prevent dirt drying hard onto unit until it can be cleaned 5 3 Oil Sludge...

Страница 12: ...4764 Fax 440 285 7005 Electronic Contact info acousa com www acousa com Southeast Sales Office 4211 Pleasant Road Fort Mill SC 29708 Toll free 800 543 4764 Fax 803 802 1063 ACO DRAIN The world s lead...

Отзывы: