
Appendix: Commissioning report
98/ 100
Oleolift-C
Appendix: Commissioning report
Commissioning and instruction of a qualified person takes place in the presence of the
authorised acceptance inspection representative and the plant operating company.
Commissioning date:
Handover date:
Oleolift-C
Oleolift-C_NS
Submerged pumps
3-6
/
600
_
DL
50
3-6
/
900
_
DL
50
3-6
/
1200
_
DL
50
3-6
/
1800
_
DL
50
3-6
/
2500
_
DL
50
6-10
/
2500
_
DL
50
6-10
/
2500
_
DL
100
6-10
/
3000
_
DL
50
6-10
/
3000
_
DL
100
15-30
/
4500
_
DL
100
DRF 150/2/G50H ex
DRF 200/2/G50H ex
DRF 100/4/100A ex
MAN 400/4/80 ex
Use location
Building/room:
Use:
Commercial company
Street:
Town/city:
Responsible persons
Competent
person
Authorised acceptance
inspection representative
Operating
company
Name:
Phone no.:
Fax no.:
Email:
Address: