
Operation
77/ 100
Oleolift-C
Î
Thread the coupling piece for the
submerged pump onto the sliding pipe:
Position
X
.
X
Î
Pull the submerged pump at an angle and
drain further into the water filling.
Air escapes from the submerged pump
chamber.
Î
Lower the submerged pump further
vertically until the coupling piece sits in
the underwater automatic coupling.
Î
Hook the chain onto the chain holder.
4.6 Executing pump station test run
Requirements:
■
The ball valve and/or gate valve is opened in the pressure pipe.
■
The control unit is connected to the power supply.