
Installation
26/ 100
Oleolift-C
3.2 Overview of earthwork and installation works
1
2
3
4
5
6
7
8
9
10
11
18
17
16
15
14
13
12
Item Work
Description
Chapter
1
Laying and connecting the on-site inlet pipe
3.3.5
2
Backfilling the excavation
3.3.12
3
Installation of shaft components
3.3.4
4
Mount oil layer sensor idOil-OIL / 1
3.4.5
5
Mount oil layer sensor idOil-OIL / 2
3.4.5
6
Mount the idOil-LIQ high liquid level sensor
3.4.5
7
Assembling the chain holder
3.4.1
8
Assembling cable gland
3.4.4
9
Laying and connecting the on-site ventilation pipe
3.3.6
10
Installation in the outdoor cabinet (optional)
3.3.10
11
Installation in the outdoor cabinet (optional)
3.3.10
12
Laying and connecting the on-site pressure pipe
3.3.8
13
Laying and connecting the on-site blank cable pipe
3.3.7
14
Digging the excavation
3.3.2
15
Mounting the level probe with protective pipe
3.4.3
16
Installing the submerged pumps
3.4.2
17
Installing the tank
3.3.3
18
Installing on-site direct suction (optional)
3.3.9
–
Execute leak test
3.3.11