
888-490-9552
www.acousa.com
OLEOP
AT
OR P OPERA
TION MANU
AL
11
3
Initial Set-Up/Commissioning
3.1 PRIOR TO FILLING THE SYSTEM
Ensure all required air and water
tests are completed before finished
installation of unit.
All system components—baffles,
coalescence units and internal piping—
must be inspected to ensure that
nothing is missing, loose or damaged.
Install provided identification plate
in the maintenance shaft as shown in
the diagram below. This will assist in
future maintenance and ordering of
consumables etc.
Identification plate provides:
Separator type identification
Nominal size
Class
Number of the LGA Test report
Volume of separator and sludge trap
Maximum storage volume and
maximum thickness of light oil layer
Maximum permissible sludge thickness
Fixing screw
Chain
Identification plate
Manhole ring
Cover levelling ring
Fixing screw
Chain
Identification plate