I-210+ User Manual
25
Chapter 5 • Upgrading
CHAPTER
5
U
PGRADING
This section covers the internal features available for an I-210+ meter, along the
AMI modules that are available for the I-210+.
Softswitches
The I-210+ meter offers a set of features which are disabled by default. The I-210+
upgrade features can be individually enabled, either in the factory before shipment
or after receipt by a customer, through a mechanism referred to as a softswitch. A
softswitch feature may subsequently be disabled, for example to allow the
customer to reuse the softswitch when a meter is replaced or moved.
MeterMate is required to upgrade or downgrade the softswitch. If any unsupported
softswitches are set, the meter shall clear all of the softswitches. The softswitch
features supported in the I-210+ are:
*Available only when the internal disconnect switch is installed (unavailable in Meter forms 12S/25S).
O: Communication
The O softswitch enables AMR communication. After installing the O softswitch,
the meter will support one of the following communication types: PSEM, SPI-1,
SPI-2 or quadrature pulse. Default AMR communication type is AMR PSEM.
V
2
: Voltage Event Monitoring
Sags and swells are th
e most common types of power quality disturbances. The
I-210+ meter counts both sag and swell events. A swell is the presence of line
voltage above the nominal voltage for a defined period of time. A sag event is the
presence of line voltage below the nominal voltage for a defined
period of time. The
I-210+ meter has two programmable thresholds for Swell and Sag voltage and one
programmable threshold for the duration. When enabled, the user can also elect to display
V
RMS
on the three segment display on the bottom left of the LCD (see
).
Softswitch
Description
O
AMR Communication
V
2
Voltage Event Monitoring
S
2
AMR Demand
F
2
*
Emergency Conservation Demand Limiting Function
J
2
*
Demand Limiting Function
U
2
*
Prepayment
Содержание I-210+
Страница 1: ...I 210 Electronic Meter User Manual 132265 TUM Revision 1 www Aclara com...
Страница 2: ......
Страница 4: ......
Страница 8: ...vi I 210 User Manual...
Страница 12: ...2 I 210 User Manual...
Страница 40: ...30 I 210 User Manual AMI Modules...
Страница 42: ...32 I 210 User Manual...
Страница 44: ...34 I 210 User Manual Form 1S 2W 1 Form 1S 2W 1 Self contained 2 wire 1 phase 1 element...
Страница 45: ...I 210 User Manual 35 Chapter 7 Site Analysis Guides Form 2S 3W 1 Self contained 3 wire 1 phase 1 element...
Страница 46: ...36 I 210 User Manual Form 3S 2W 1 Form 3S 2W 1 Transformer rated 2 wire 1 phase 1 element...
Страница 47: ...I 210 User Manual 37 Chapter 7 Site Analysis Guides Form 3S 3W 1 Transformer rated 3 wire 1 phase 1 element...
Страница 48: ...38 I 210 User Manual Form 4S 3W 1 Form 4S 3W 1 Transformer rated 3 wire 1 phase 1 element...
Страница 49: ...I 210 User Manual 39 Chapter 7 Site Analysis Guides Form 12S 3W 1 Self contained 3 wire 1 phase 2 element...
Страница 50: ...40 I 210 User Manual Form 12S 3W N Form 12S 3W N Self contained 3 wire network 2 element...
Страница 51: ...I 210 User Manual 41 Chapter 7 Site Analysis Guides Form 25S 3W N Self contained 3 wire network 1 element...
Страница 52: ...42 I 210 User Manual Form 25S 3W N...
Страница 53: ...CHAPTER 8 DIAGRAMS ANSI Meter Diagrams Meter Outline Drawings...
Страница 54: ...44 I 210 User Manual...