The I-210+ meter has many features intended for ease of use on site.

Operation

• Nameplate and label information 

• Five digit alphanumeric display with key annunciators 

• Instantaneous RMS voltage 

• Instantaneous demand 

• Service error caution 

These features are described in detail in Chapter 3, 

Operating Instructions

 on page 

11. 

Theory of Operation

This section contains the general circuit configuration of the I-210+ meter. The 

theory of operation is described in conjunction with the following block diagram.

Содержание I-210+

Страница 1: ...I 210 Electronic Meter User Manual 132265 TUM Revision 1 www Aclara com...

Страница 2: ......

Страница 3: ...oftware or firmware described in this document is furnished under a license and may be used or copied only in accordance with the terms of such license Disclaimer The information in this document is s...

Страница 4: ......

Страница 5: ...the impacted device s Consult the manufacturer or field service technician for help Class B equipment is intended for use in a residential environment The equipment has been tested and found to compl...

Страница 6: ...without notice or obligations Should a conflict arise between the general information contained in this publication and the contents of drawing or supplementary material or both the latter shall take...

Страница 7: ...n accordance with established safety procedures in the proper care and use of protective equipment such as rubber gloves hard hat safety glasses or face shields flash clothing etc in accordance with e...

Страница 8: ...vi I 210 User Manual...

Страница 9: ...y 9 AMR Interface 9 Disconnect Switch 9 Remote Disconnect Features 10 Outage Management and Restoration 10 Enabling Outage Management and Restoration in I 210 10 Chapter 3 Operating Instructions 11 Na...

Страница 10: ...ftswitches 25 O Communication 25 V2 Voltage Event Monitoring 25 S2 AMR Demand 26 F2 Emergency Conservation Demand Limiting 26 J2 Demand Limiting Function 26 U2 Pre Payment Management PPM 26 AMI Module...

Страница 11: ...r sockets or other metering equipment presents the danger of electrical shock All work on these products must be performed by qualified industrial electricians and metering specialists only All work m...

Страница 12: ...2 I 210 User Manual...

Страница 13: ...meter design allows utilities to integrate a range of AMR choices to suit each application s requirement inside a standard metering platform The I 210 and I 210 n are available with an internal connec...

Страница 14: ...ptions may be installed on a supporting plastic bridge which mounts into the meter base or they may be mounted in the Nameplate Carrier itself depending on the size and construction details of the spe...

Страница 15: ...e performance of the I 210 meter meets or exceeds the following industry standards ANSI C12 1 C12 10 C12 20 and all standards incorporated by reference Form Wires Circuit Elements SC TR Class Voltage...

Страница 16: ...Class Volt Kt Kh TA Starting Watts 2S 320 240 2 20 50 5 184 2S 200 240 1 10 30 3 24 2S 100 240 0 5 5 15 1 62 1S 100 240 0 5 5 15 1 62 1S 100 120 0 25 2 5 15 0 81 3S 20 240 0 1 1 2 5 0 324 3S 20 120 0...

Страница 17: ...settable option of Instantaneous Power or AMR demand may appear on the LCD The S2 softswitch must be enabled and an appropriate AMR module must be used for the AMR demand feature Factory settable opti...

Страница 18: ...eric display with key annunciators Instantaneous RMS voltage Instantaneous demand Service error caution These features are described in detail in Chapter 3 Operating Instructions on page 11 Theory of...

Страница 19: ...d configuration constants Meter data quantities are updated at each power fail event Stored data includes error detection provisions The non volatile memory does not require a battery to retain inform...

Страница 20: ...ity Locked open Locked closed Armed for manual closure Opened and held open Open due to outage management Open due to load control service disconnect Closed with service connected If the meter detects...

Страница 21: ...nd 4S only 1 Multiply by Constant 11 ANSI C12 10 Form Number 2 Voltage Transformer Ratio 12 Month Year of Manufacture 3 Current Transformer Ratio 13 Catalog Number 4 Softswitch Selection Box 14 Nomina...

Страница 22: ...arameters that make on site inspection of meters simple and fast The LCD is shown below Each indicator on the display is named in the list below followed by detailed explanations 1 Billing Data Displa...

Страница 23: ...indicators show whether the three character display in the lower left of the LCD is Volts or kilowatts The kWh energy value along with the kWh annunciator is displayed during normal operation is displ...

Страница 24: ...hen values of instantaneous power are displayed The auto ranging kW value will be scaled to show the maximum available precision in one of the following formats XXX X XX XX X This indicates that there...

Страница 25: ...ue impacts the energy and demand values that are displayed on the LCD For example the energy displayed on the LCD is the product of the energy accumulated by the meter times the TF This is frequently...

Страница 26: ...the current load conditions Instantaneous Voltage The I 210 can be configured to display instantaneous voltage in the lower row of the LCD This value is refreshed every second The Instantaneous Voltag...

Страница 27: ...Kt watt hours are accumulated So the Kh of the disk analog and the Kt of the test pulse are always related in the I 210 meter by the expression Kh 10 x Kt The values of Kh and Kt were chosen for the a...

Страница 28: ...textual indicators Received and Delivered indicate whether the energy accumulated is delivered to the load or received from the load The right pointing arrow will illuminate when energy accumulation i...

Страница 29: ...is accumulated normally Configuration Port The optical configuration port is intended primarily for use in a controlled indoor environment and is not shielded from ambient light Bright light condition...

Страница 30: ...d number of times two for example 7 Stop the standard when the disk analog transitions from all segments on to all segments off for the desired number of times 8 Calculate the accumulated watt hours a...

Страница 31: ...ter Kt value listed on the nameplate 2 Select the desired voltage and current level s on the test equipment 3 Install the meter in the test socket making certain that the socket is wired and or config...

Страница 32: ...not recommended Instead return the whole meter as described in Returning Product on page 1 Cleaning During cleaning take care to avoid damaging or contaminating any gold plated contacts of the connect...

Страница 33: ...an electronic subsystem of the meter and indicates a condition that is not user serviceable The meter must be returned to the factory for service Caution Description Received kWh This flag is set when...

Страница 34: ...o transformer rated installation with correctly sized CTs Poor connection at socket terminal Replace socket terminal Meter runs slow Socket wiring error Rewire according to applicable diagram Meter in...

Страница 35: ...ilable in Meter forms 12S 25S O Communication The O softswitch enables AMR communication After installing the O softswitch the meter will support one of the following communication types PSEM SPI 1 SP...

Страница 36: ...c heating or cooling and other safety needs The Demand Limiting function enforces such a limit remotely U2 Pre Payment Management PPM With a remote connect disconnect switch and a two way AMR system i...

Страница 37: ...nnect Disconnect Model 1S TWACS No 1SATDR 1S TWACS Yes 1SDTDR 1S Synergize RF No 1SARDR 1S Synergize RF Yes 1SDRDR 2S TWACS No 2SATDR 2S TWACS Yes 2SDTDR 2S Synergize RF No 2SARDR 2S Synergize RF Yes...

Страница 38: ...0 Module Removal 1 Disconnect the CT connector from the socket on the electronics module 2 Grasp the snaps on either side of the nameplate carrier between the thumb and index finger and press them tog...

Страница 39: ...meter is particular to a set of current sensors and electronics module Interchanging these components causes the meter to lose calibration and revert to an unconfigured mode which is indicated by on...

Страница 40: ...30 I 210 User Manual AMI Modules...

Страница 41: ...r and socket are installed according to local and national codes Upon applying power to the meter verify meter operations by observing the display For the first 5 seconds the register will display an...

Страница 42: ...32 I 210 User Manual...

Страница 43: ...ion guides The phasor diagrams are shown for informational purposes only The meter does not provide the information necessary to determine the phase relationships between voltages and currents IMPORTA...

Страница 44: ...34 I 210 User Manual Form 1S 2W 1 Form 1S 2W 1 Self contained 2 wire 1 phase 1 element...

Страница 45: ...I 210 User Manual 35 Chapter 7 Site Analysis Guides Form 2S 3W 1 Self contained 3 wire 1 phase 1 element...

Страница 46: ...36 I 210 User Manual Form 3S 2W 1 Form 3S 2W 1 Transformer rated 2 wire 1 phase 1 element...

Страница 47: ...I 210 User Manual 37 Chapter 7 Site Analysis Guides Form 3S 3W 1 Transformer rated 3 wire 1 phase 1 element...

Страница 48: ...38 I 210 User Manual Form 4S 3W 1 Form 4S 3W 1 Transformer rated 3 wire 1 phase 1 element...

Страница 49: ...I 210 User Manual 39 Chapter 7 Site Analysis Guides Form 12S 3W 1 Self contained 3 wire 1 phase 2 element...

Страница 50: ...40 I 210 User Manual Form 12S 3W N Form 12S 3W N Self contained 3 wire network 2 element...

Страница 51: ...I 210 User Manual 41 Chapter 7 Site Analysis Guides Form 25S 3W N Self contained 3 wire network 1 element...

Страница 52: ...42 I 210 User Manual Form 25S 3W N...

Страница 53: ...CHAPTER 8 DIAGRAMS ANSI Meter Diagrams Meter Outline Drawings...

Страница 54: ...44 I 210 User Manual...