![ACI Hoist & Crane NECH Series Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/aci-hoist-and-crane/nech-series/nech-series_operation-manual_458013015.webp)
Electric Chain Hoists (Single Brake)
Model NECH
PAGE: 15
NECH-0214
ACI Hoist & Crane | 2721 NE 4th Ave Pompano Beach, FL 33064| 954.367.6116
Visit WWW.ACIHOIST.COM for the most current information
4.0
INSTALLATION
ACI electric hoists are lubricated and tested before being shipped from the factory. To place a hoist in service, install the
hoist onto a beam by adjusting the hoist appropriately for the flange width. Then connect it to an electrical service and
perform pre-operation tests, checks and inspections.
4.1
Prior to Installing Hoist
•
Read and observe the instructions and warnings contained in this manual. Read and observe any instructions
and warning tags attached to the hoist.
•
Locate any vent plugs attached to or included with the hoist and trolley. Remove solid shipping plug or plugs.
•
Check that the crane, monorail, or other supporting structure where the hoist will be installed has a load rating
capable to handle loads equal to or greater than the rated load capacity of the hoist.
•
If hoist is to be installed on an existing crane, the crane should be run to a location where it will cause the least
interference with other cranes and operations in the area; and all controllers placed in the off position.
•
If the hoist is to be installed on an existing crane, and the crane runway remains energized because of other
cranes operating on the same runway; stops or a signal person(s), located full-time at a visual vantage point for
observing the approach of active crane(s), shall be provided to prohibit contact by the active crane(s) with the
idle crane.
•
If personnel will be required to work on the runway during installation, a guard or barrier shall be installed
between adjacent runways for the length of the established work area to prevent contact between persons
performing installation and a crane on the adjacent runway.
Prior to installing the hoist check for any damage that may have occurred to the hoist
during shipment.
DO NOT
install a damaged hoist.
Only qualified personnel with proper supervision shall install the hoist on the
monorail and perform the final pre-operation inspection.
Before installing, removing, inspecting, or performing any maintenance on a hoist,
the main switch shall be de-energized. Lock and tag the main switch in the de-
energized position in accordance with ANSI Z244.1.
Follow other maintenance procedures outlined in this manual and applicable ASME
B30 volume(s). Additional WARNINGS are listed in various portions of this manual.
Personnel shall read and follow these WARNINGS. Failure to read and comply with
these WARNINGS as well as other instructions or any limitations noted in this manual
and applicable ASME B30 volumes could result in serious bodily injury or death,
and/or property damage.