ACER V206HQL
10
4.2 Assembly Procedures
Preparation before assemble:
1.Clean the room for work
2.Identify the area for material
3.Prepare the implement, equipment, materials as bellow
:
1) working table
2) Screw-driver
3) Knife
4) glove
5) cleaning cloth
6) ESD protection
After unplugging the power cord, the power board still have power energe. Please pay attention when
disassembling/assembling Power BD.
S1
Assemble the MAIN board,
power board and SPK.
Before Disassembling & Assembling, monitor need to be put on the sponge
and the Insulation glove must be wore during the process.
Assemble the SPK to SHD as picture 1.
Insert
the FFC to the I/F as picture 2.
Insert the DP-Wire to the I/F BD and the P/BD.
Insert the P/BD-Wire and SPK-Wire to I/F BD,
Place the I/F BD and the P/BD to SHD and lock all screws as the picture 3.
Put Mylar on the Power BD as picture 4.
PICTURE 1
PICTURE 2 PICTURE 3 PICTURE 4
S2
Assemble the ASSY TRIM
Insert the C/B-FFC to C/B as circle frame, and insert them into the BZL
Assemble the panel on the BZL
Stick Mylar on C/B FFC as square frame and Insert the C/B-FFC to the PCBA as
circle frame.
PICTURE 1
PICTURE 2
I/F BD
P/BD
I/F BD
P/BD