background image

ACER V206HQL 

 

10

 

 

 

 

4.2 Assembly Procedures 

Preparation before assemble: 
1.Clean the room for work 
2.Identify the area for material 
3.Prepare the implement, equipment, materials as bellow

 

1)  working table   
2)  Screw-driver   
3)  Knife     
4)    glove   
5)    cleaning cloth     
6)    ESD protection   

After unplugging the power cord, the power board still have power energe. Please pay attention when 
disassembling/assembling Power BD.

 

S1 

Assemble the MAIN board, 

power board and SPK.

 

Before  Disassembling  &  Assembling,  monitor  need  to  be  put  on  the  sponge 
and the Insulation glove must be wore during the process. 

Assemble the SPK to SHD as picture 1. 
Insert

 

the FFC to the I/F as picture 2.   

Insert the DP-Wire to the I/F BD and the P/BD.   
Insert the P/BD-Wire and SPK-Wire to I/F BD, 
Place the I/F BD and the P/BD to SHD and lock all screws as the picture 3. 
Put Mylar on the Power BD as picture 4. 

PICTURE 1

                 

 

PICTURE 2                                                                  PICTURE 3                                                PICTURE 4

 

 

S2 

Assemble the ASSY TRIM

 

Insert the C/B-FFC to C/B as circle frame, and insert them into the BZL 
Assemble the panel on the BZL 
Stick Mylar on C/B FFC as square frame and Insert the C/B-FFC to the PCBA as 
circle frame. 

PICTURE 1

                                                                             

PICTURE 2 

 

I/F BD 

P/BD 

I/F BD 

P/BD 

Содержание V206HQL

Страница 1: ...Acer Monitor V206HQL LIFECYCLE EXTENSION GUIDE ...

Страница 2: ... 3 Mechanical Instruction 7 4 Disassembly and Assembly SOP 8 5 Troubleshooting 12 6 FRU List 14 Safety Notice Any person attempting to service this chassis must familiarize with the chassis and be aware of the necessary safety precautions to be used when serving electronic equipment containing high voltage ...

Страница 3: ...pairing method may damage equipment or products It is recommended that service engineers should have repairing knowledge experience as well as appropriate product training per new model before performing the service procedures NOTICE To avoid electrical shocks the products should be connect to an authorized power cord and turn off the master power switch each time before removing the AC power cord...

Страница 4: ... Exploded Diagram Item ODM DESCRIPTION Item ODM DESCRIPTION 1 ASSY BZL 14 ASSY RC 2 PCBA CTRL 15 SCRW 3 FFC WIRE 16 ASSY CLMN 4 LCDM 17 CLIP 5 PCB SPS BD 18 ASSY BASE 6 FFC LVDS 19 TAPE 7 PCB IF BD 8 SCRW 9 SCRW 10 ASSY SHD 11 SPK 12 SCRW 13 TAPE ...

Страница 5: ...l V206HQL The wiring connectivity position will be different according to the ACTUAL PCBA connector position Please base on different SKU refer to below diagram NOTE INF BD Interface Board PWR BD Power Board CTRL BD Control Board 1 SKU without USB without HDMI DP 2 SKU without USB with HDMI DP ...

Страница 6: ...ACER V206HQL 6 3 SKU with USB without HDMI DP 4 SKU with USB with HDMI DP ...

Страница 7: ... tools that would typically can be used to disassemble the product to a point where components and materials requiring selective treatment can be removed Tool Description working table Screw driver Philips head screwdriver Hex head screwdriver Knife glove cleaning cloth ESD protection ...

Страница 8: ...w driver Philips head screwdriver Hex head screwdriver 3 knife 4 glove 5 cleaning cloth 6 ESD protection After unplugging the power cord the power board still have power energe Please pay attention when disassembling assembling Power BD S1 Disassemble the RC Rear Case stand and base Before Disassembling Assembling monitor need to be put on the sponge and the Insulation glove must be wore during th...

Страница 9: ...assemble the MF from panel Tear off the tapes take out the Panel and the CTRL BD of the MF S5 Disassemble I F BD P BD and SPK from SHD Disassembled the Mylar and unlock all screws Disassemble the I F BD from the SHD and extract the P BD wire Extract the FFC LVDS from the I F BD Disassemble the P BD from the SHD Disassemble SPK PICTURE 1 PICTURE 2 NOTE Circuit boards 10 cm has been highlighted with...

Страница 10: ... monitor need to be put on the sponge and the Insulation glove must be wore during the process Assemble the SPK to SHD as picture 1 Insert the FFC to the I F as picture 2 Insert the DP Wire to the I F BD and the P BD Insert the P BD Wire and SPK Wire to I F BD Place the I F BD and the P BD to SHD and lock all screws as the picture 3 Put Mylar on the Power BD as picture 4 PICTURE 1 PICTURE 2 PICTUR...

Страница 11: ...S cable S5 Assemble SHD Lock the Hexagonal screws as picture 1 Use jig to put the SHD in correct position on Panel Take off the jig and stick two AL tapes as picture 2 PICTURE 1 PICTURE 2 S6 Assemble RC stand and base Assemble the RC with screw Assembly the Stand and the Base to Monitor NOTE Circuit boards 10 cm has been highlighted with the yellow rectangle as above image shows Please detach the ...

Страница 12: ...d monitor is in compliance which may be causing the input signal frequency mismatch Display is missing center shift or too small or too large in display size Using OSD adjust RESOLUTION CLOCK CLOCK PHASE H POSITION and V POSITION with non standard signals Using OSD in case of missing full screen image please select other resolution or other vertical refresh timing Using OSD in case of missing full...

Страница 13: ...cord is properly connected to the monitor LED displays amber color Check if video signal cable is properly connected at the back of monitor Check if the power of computer system is ON Abnormal Sound Only Audio Input model Optional No sound or sound level is too low Check the audio cable with the host PC is connected Check if the volume setup of the host PC is in minimum position and try to raise t...

Страница 14: ...e from those given in the FRU list of this printed Service Guide You MUST use the local FRU list provided by your regional office to order FRU parts for repair and service of customer machines NOTE To scrap or to return the defective parts you should follow the local government ordinance or regulations on how to dispose it properly or follow the rules set by your regional office on how to return i...

Отзывы: