System Utilities
2-47
SSD Recovery Method
0
NOTE:
NOTE
:
Only one SKU supports iFFS partition and ExpressCache partition:
2.5” HDD and 24 GB SSD (example: 2.5” HDD 500 GB + 24 GB SSD SKU). Other
skus can skip this action (example: 120 GB SSDK only SKU or 2.5” HDD only
SKU.)
When changing a new 24 GB SSD, it is necessary to rebuild iFFS partition and
Express Cache partition.
If the 24 GB SSD partition is deleted, it is necessary to rebuild iFFS partition and
Express Cache partition.
To rebuild the iFFS partition:
1. Create a text file,
Creatisrt.txt
, with the following content.
Figure 2-84. Creatisrt.txt
2. Copy
Creatirst.txt
to a WinPE USB flash disk.
3. Insert the USB flash disk with WinPE into the system and press the Power button.
4. Press
F2
during boot and change the BIOS Main menu item
F12 Boot Menu
to
Enabled
.
Figure 2-85. F12 Boot Menu enable
5. Press
F10
to Save and exit.
6. Press
F12
during the POST (power-on self-test) screen to enter the
Boot Option
Menu
. Select
USB HDD
and boot to WinPE mode.
Содержание Aspire V5-573
Страница 1: ...Aspire V7 582 V5 573 SERVICE GUIDE ...
Страница 11: ...CHAPTER 1 Hardware Specifications ...
Страница 14: ...1 4 ...
Страница 58: ...1 48 Hardware Specifications and Configurations ...
Страница 59: ...CHAPTER 2 System Utilities ...
Страница 76: ...2 18 System Utilities Figure 2 20 No AC Power Detected 1 or 2 Figure 2 21 No AC Power Detected 2 of 2 ...
Страница 110: ...2 52 System Utilities ...
Страница 111: ...CHAPTER 3 Machine Maintenance Procedures ...
Страница 114: ...3 4 ...
Страница 123: ...Machine Maintenance Procedures 3 13 ID Size Torque Quantity Screw Type Red Call out M2 5 6 I 2 4 0 2KGF CM 17 ...
Страница 127: ...Machine Maintenance Procedures 3 17 4 Remove HDD cable from HDD connector C Figure 3 9 Figure 3 9 HDD Cable C ...
Страница 133: ...Machine Maintenance Procedures 3 23 ID Size Torque Quantity Screw Type C M2 5 3I 2 0 0 2KGF CM 1 ...
Страница 142: ...3 32 Machine Maintenance Procedures ID Size Torque Quantity Screw Type A M2 5 3 0 I 1 8 0 2KGF CM 6 ...
Страница 144: ...3 34 Machine Maintenance Procedures ID Size Torque Quantity Screw Type B M2 0 4 2 0 1 8 0 2KGF CM 1 ...
Страница 148: ...3 38 Machine Maintenance Procedures ID Size Torque Quantity Screw Type D M2 5 3I 2 0 0 2KGF CM 1 ...
Страница 180: ...3 70 Machine Maintenance Procedures ID Size Torque Quantity Screw Type D M2 5 3I 2 0 0 2KGF CM 1 ...
Страница 184: ...3 74 Machine Maintenance Procedures ID Size Torque Quantity Screw Type B M2 0 4 2 0 1 8 0 2KGF CM 1 ...
Страница 186: ...3 76 Machine Maintenance Procedures ID Size Torque Quantity Screw Type A M2 5 3 0 I 1 8 0 2KGF CM 6 ...
Страница 199: ...Machine Maintenance Procedures 3 89 Figure 3 109 Connecting HDD B ...
Страница 201: ...Machine Maintenance Procedures 3 91 ID Size Torque Quantity Screw Type C M2 5 3 0 I 1 8 0 2KGF CM 1 ...
Страница 203: ...Machine Maintenance Procedures 3 93 ID Size Torque Quantity Screw Type Red Call out M2 5 6 I 2 4 0 2KGF CM 17 ...
Страница 205: ...CHAPTER 4 Troubleshooting ...
Страница 229: ...CHAPTER 5 Jumper and Connector Locations ...
Страница 238: ...5 10 Jumper and Connector Locations ...
Страница 239: ...CHAPTER 6 FRU Field Replaceable Unit List ...
Страница 240: ...6 2 Exploded Diagrams 6 4 FRU List 6 7 Screw List 6 46 ...
Страница 242: ...6 4 FRU Field Replaceable Unit List Exploded Diagrams 0 Figure 6 1 System Exploded Diagram 1 2 3 4 5 6 7 8 10 9 12 11 ...
Страница 285: ...CHAPTER 7 Model Definition and Configuration ...
Страница 286: ...7 2 Acer Aspire V7 582 7 3 Acer Aspire V5 573 7 28 ...
Страница 360: ...7 76 Model Definition and Configuration ...
Страница 361: ...CHAPTER 8 Test Compatible Components ...
Страница 362: ...8 2 Microsoft Windows 8 Environment Test 8 4 ...
Страница 372: ...8 12 Test Compatible Components ...
Страница 373: ...CHAPTER 9 Online Support Information ...
Страница 374: ...9 2 Introduction 9 3 ...
Страница 376: ...9 4 Online Support Information ...