4. Assembly and Disassembly Procedures (continued)
Put a rear cover on the assembled unit and push
the rear cover on the positions marked as No.1~4 in
priority order for mechanisms engagement.
S14
S17
S15
Assemble
.
the hinge covers as the below picture.
Align the base cover with the stand and push the
base cover towards the top of the monitor for
assembling the base
Lift up the LCD module, check the acer logo if it is
firmly attached to the front bezel, connect a video
cable and power cord with the monitor and turn on
the monitor for functionality check.
S18
S19
Turn off the monitor and remove the video cable
and power cord from the monitor. Stick a screen
protector on the front bezel with adhesive tapes.
S20
1
1
2
2
3
3
4
4
Use a Phillips-head screwdriver to tighten three
screws for fix hinge cover with the hinge.
(No.4
)
~6 Screw size=M4x8; Torque=6-7kgfxcm
Use a Phillips-head screwdriver to tighten three
screws for fixing hinge with the rear cover.
(No.1~3
)
Screw size=M4x9, Torque=12
±1
kgfxcm
4
5
6
3
1
2
S16
Take a arm, then install the arm to the hinge cover
following the direction as the picture below.
Take a EPE bag to cover the LCD monitor, put the
monitor face down on the table.
S21
16
ACER A211H/A221HQ
Содержание A221HQV
Страница 1: ...Model ID RG215AC CAU AN02 ACER_LCD_A211H A221HQ_SM20100512V1 ...
Страница 14: ...3 Exploded Diagram 3 1 Product Exploded Diagram 12 Go to contents page ACER A211H A221HQ ...
Страница 15: ...3 Exploded Diagram continued 3 2 Packing Exploded Diagram 13 Go to contents page ACER A211H A221HQ ...