Installation and Operation Manual
Chapter
2 Installation and Setup
ACE-3105, ACE-3205 Ver. 5.2
Connecting to a Control Terminal
2-7
Figure
2-11. ACE-3105 – Electrical Ethernet Ports
Figure
2-12. ACE-3205 – Electrical Ethernet Ports
2.
Connect the other end of the cable to the packet-switched network
equipment.
2.7
Connecting to a Control Terminal
ACE-3105, ACE-3205 can be managed out-of-band via the RS-232/V.24 (DCE)
terminal control port, which has a 9-pin, D-type, female connector.
Figure
2-13. ACE-3105 - Control Port
Figure
2-14. ACE-3205 - Control Port
³
To connect the terminal control cable:
1.
Connect the standard DB-9 to DB-9 control cable (supplied) to the 9-pin DTE
connector of the management station.
2.
Connect the other end of the control cable to the DB-9 connector designated
CONTROL in ACE-3105, ACE-3205.
Terminal cables must have a frame ground connection. Use ungrounded cables
when connecting a supervisory terminal to a DC-powered unit with floating
ground. Using improper terminal cable may result in damage to supervisory
terminal port.
Caution
Содержание ACE-3205
Страница 1: ...ACE 3105 ACE 3205 Cell Site Gateways Version 5 2 INSTALLATION AND OPERATION MANUAL The Access Company...
Страница 2: ......
Страница 352: ...Chapter 6 Monitoring and Diagnostics Installation and Operation Manual 6 114 Technical Support ACE 3105 ACE 3205 Ver 5 2...
Страница 380: ...Appendix D Clock Modes Installation and Operation Manual D 8 DSL and PSN Timing Modes ACE 3105 ACE 3205 Ver 5 2...
Страница 396: ...Appendix E Encapsulation over PSN Installation and Operation Manual E 16 5BClock Encapsulation ACE 3105 ACE 3205 Ver 5 2...
Страница 414: ......
Страница 416: ......
Страница 417: ......