Installation and Operation Manual
Appendix
C ATM OAM Functionality
ACE-3105, ACE-3205 Ver. 5.2
OAM Modes of Operation over ATM
C-3
When a failure is detected on the physical port, AIS state is declared and
F4 end-to-end AIS cells are generated towards the forward direction.
Figure
C-4. VP Intermediate Point – Case D
•
For OAM loopback cells (see
), an ID match check
determines the loopback state:
Figure
C-5. VP Intermediate Point – Case E
VC Intermediate Point
When a VC connection point is set as an intermediate point, it operates as
follows:
•
If the other side of the VC XC is also set as an intermediate point:
F5 segment and end-to-end OAM cells are forwarded transparently to the
other side of the XC. F4 segment and end-to-end OAM cells are dropped
from the cell stream.
Figure
C-6. VC Intermediate Point – Case A
When a failure is detected on the physical port, AIS state is declared and
F5 segment AIS together with end-to-end AIS cells are generated towards
the forward direction.
Содержание ACE-3105
Страница 1: ...ACE 3105 ACE 3205 Cell Site Gateways Version 5 2 INSTALLATION AND OPERATION MANUAL The Access Company...
Страница 2: ......
Страница 352: ...Chapter 6 Monitoring and Diagnostics Installation and Operation Manual 6 114 Technical Support ACE 3105 ACE 3205 Ver 5 2...
Страница 380: ...Appendix D Clock Modes Installation and Operation Manual D 8 DSL and PSN Timing Modes ACE 3105 ACE 3205 Ver 5 2...
Страница 396: ...Appendix E Encapsulation over PSN Installation and Operation Manual E 16 5BClock Encapsulation ACE 3105 ACE 3205 Ver 5 2...
Страница 414: ......
Страница 416: ......
Страница 417: ......