Robot Storm Manual
12
VIII. Installation and maintenance
1 Installation and Commissioning
Please check the components according to the list to assemble components before installation;
After installation, plug the cable and turn on the machine to check whether each part runs normally. If no,
immediately turn off the machine for troubleshooting.
2. Appearance Inspection
To ensure the safe use of the machine, please check the following before startup:
Whether the warning sign is intact, visible and stuck correctly.
Whether parameters of power supply are consistent with the requirements of the machine.
Whether screws of each component and components of the steering wheel are loose.
Whether the connectors and terminals are loose.
Whether the machine is placed stably; whether the adjustment of the casters and the top foot are proper.
Whether the machine is placed in the proper area.
3. Running Inspection
Whether the speaker works normally.
Whether the daylight lamp and the button light are on.
Whether the image is clear and normal.
4 Maintenance
Before operation, test run must be done before the machine is used;
When there is dirt on the machine, wipe it with a soft cotton cloth with detergent;
After the new machine has been used for one month, check whether each part runs normally;
Often check the machine;
The machine must be cleaned and maintained once a month.
Screen PVC will crack and wear in the use process, please check and clean once in a week.
5. Ball strength adjustment
When the ball has no velocity or offset, the velocity can be by 1
in the figure. First loosen the nut 2, adjust the screw 3. Adjust the
two screws to tighten and make the ball gain velocity, and
unscrew to make ball lose velocity
This mechanism is adjusted when the ball is weak due to wear of
the silicone wheel. If the silicone wheel is completely worn, you
will need to replace it with a new one.
Содержание Robot Storm
Страница 13: ...Robot Storm Manual 11 I O Board ...