Door
Open the iron work bag. The numbers of the detailed views indicate the assembly order. Tighten the assembly definitively.
The wheels on top of the door do not have a washer; at the bottom, the wheels have a washer, as indicated on the detailed views.
The wheels are tightened by screwing them at 5cm from the side.
Silicone is used on both assembly profiles. Here, the silicone serves as sealer, avoiding that the profiles can slide.
Slide the door on both assembly profiles. Then place the glass in the door and put the rubbers in place.
Install the handle on the inside panel of the door, halfway the vertical door profile. The handle also serves as door stop.
Cross Beam
Open the roof window iron work bag. The numbers of the detailed views indicate the assembly order. Tighten the assembly definitively. Install
the elongated plates with the bulge in the bolt slot of the crossbeam.
Roof Window
The numbers of the detailed views indicate the assembly order. Put the rubbers of the profiles in place after installation of the glass.
Install the glass on top of the sidewall and slide it upward between the roof profiles until it does not rest on the sidewall anymore. Pull the glass
downward in the provided slot. Press the crossbeam until it closely fits the underlying glass and assemble it definitively with the special
assembly bolts. Put the rubbers in place on the two roof profiles, in the same way as you did for the rest of the roof.
Also put the rubber on the crossbeam, cut off the rubber diagonally so that it closely fits.
Press a piece of rubber in the round hole of the ridge to avoid the roof window from sliding.
To open the roof window, slide the round bar on the curl in the roof window and on the bolt in the crossbeam. If the roof window is not open,
the round bar is put on the support.
Water Drainage
Install all parts with silicone to seal and to lock.
Anchors
Put the greenhouse level again accounting for the desired slope (stimulate water drainage). Support the entire greenhouse with ground until it
is completely closed. For the anchors, dig a hole at the inside of the greenhouse, in each of the corners. Install the anchors with the stop bolts
and fill the holes with concrete.
ATTENTION
: Greenhouses of 7 or 8 windows long also have a centre anchor.
V
Содержание S106
Страница 2: ......
Страница 37: ...2 FRAME KADER CADRE 4 1a 1b RAHMEN 1a 1b 1a 1b 1a 1b 2 2 2 2 1a 1b...
Страница 40: ...2 PREPARATION VOORBEREIDING PR PARATION 6 1 VORBEREITUNG 2 2 A B A B 2 2 2...
Страница 44: ...A B A B 2 1 B 3 A A B 4 A B A B 4 DOOR DEUR PORTE 10 B 2 2 Qty Fig Nr L mm 708 1852 A 1 2 3 T R...
Страница 45: ...1 2 3 4 DOOR DEUR PORTE 11 T R 3 2 1 4...
Страница 47: ...1 2 2 13 DOOR DEUR PORTE T R b 1 a 2X...
Страница 55: ...3 WINDOW OPENER RAAMOPENER OUVRE FEN TRE FENSTER FFNER 19 2 1 2 1 3 OPTION OPTIONEEL...
Страница 56: ...OUVRE FEN TRE WINDOW OPENER RAAMOPENER FENSTER FFNER 20 6 7 1 2 3 4 5 8 a b 2 4 1 6 3 7 5 8...
Страница 58: ...ABDECKPLATTEN AFDEKPLAATJES PLAQUETTES DE FINITION 22 COVER PLATES...
Страница 59: ...ACD S106H B manual DBER03122019...