Façade
Assemble the ridge plate with the bulges pointing downward, in the bolt slots.
ATTENTION: SEE PICTURE Page 1B: only with S1and R2 greenhouse types: The corner profile roof (profile G for R2 greenhouses,
profiles J & K for S1 greenhouses) has a little hole (Ø3); that profile must be assembled so that this little hole is situated at the side of
the ridge .
You assemble 2 façades.
Stop Bolts
During the entire assembly
!10!
stop bolts are placed!!!
Si stop bolts
During the entire assembly
!2!
stop bolts are placed, for greenhouses with 7& 8 windows, there are
!3!
stop bolts provided. You
assemble 2 sidewalls.
Assembly
You now have 2 façades and 2 sidewalls.
Slide the panels one into the other until the end, the stop bolts are immediately tightened firmly and definitively.
Roof
-
First install the ridge (profile C) on top of the 2 façades and fix it definitively with the stop bolts.
-
Greenhouses that are 7 & 8 windows long are provided with 2 glass rods (profile A) of each 2 stop bolts.
-
Place the glass rods (profiles A) between the sidewall and the ridge you just put in place (profile C) .
-
Assemble the traction strips (profiles B) to the ridge (profile C) in the corner and subsequently together with the glass rod (profile A) at the
sidewall.
ATTENTION1 :
the traction strips start from the façade in the ridge and go down to the gutter. (See detail pag drawing "ROOF")
S
ATTENTION2 :
If you bought a ridge decoration, mount it on the ridge profile
before
mounting the ridge profile itself
Façade Supports
Only for greenhouses of types R3 , R4, S2 & S3.
The two façade supports are assembled between the façade and the ridge.
Supports
Only for greenhouses that are 7 & 8 windows long and R4 greenhouses.
Remove 2 glass rods from the sidewall having the same section as the glass rods of the roof in which the stop bolts are inserted. Place two stop
bolts per profile. Reinstall the glass rods, but use an M6x16 bolt at the bottom.
Install two gutter supports between the sidewall and the roof with the stop bolts provided.
Also install a support in the ridge of the roof using the stop bolts provided.
Содержание S104H-B
Страница 1: ...Manual S104H B ...
Страница 2: ......
Страница 36: ...2 FRAME KADER CADRE 4 1a 1b RAHMEN 1a 1b 1a 1b 1a 1b 2 2 2 2 1a 1b ...
Страница 39: ...2 2 A B A B 2 2 2 2 PREPARATION VOORBEREIDING PRÉPARATION 6 1 VORBEREITUNG ...
Страница 43: ...A B A B 2 1 B 3 A A B 4 A B A B 4 DOOR DEUR PORTE 10 B 2 2 Qty Fig Nr L mm 708 1852 A 1 2 3 TÜR ...
Страница 44: ...1 2 3 4 DOOR DEUR PORTE 11 TÜR 3 2 1 4 ...
Страница 46: ...1 2 2 13 DOOR DEUR PORTE TÜR b 1 a 2X ...
Страница 53: ...3 WINDOW OPENER RAAMOPENER OUVRE FENÊTRE FENSTERÖFFNER 19 2 1 2 1 3 OPTIE OPTION ...
Страница 54: ...OUVRE FENÊTRE WINDOW OPENER RAAMOPENER FENSTERÖFFNER 20 6 7 1 2 3 4 5 8 a b 2 4 1 6 3 7 5 8 ...
Страница 56: ...ABDECKPLATTEN AFDEKPLAATJES PLAQUETTES DE FINITION 22 COVER PLATES ...
Страница 57: ...ACD S104H B manual DBER27092019 ...